Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2021 at 8:00 PM
Updated November 14, 2023
Site work and paving for a mixed-use development in Corpus Christi, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
**As of July 23, 2021, this project has not yet been awarded. A timeline for award has not yet been established. New construction of a pedestrian bridge and multi use trail at the Del Mar College South Campus located at Rodd Field Rd. and Yorktown Blvd. The project consists of construction of 1,400 LF of 10' wide concrete multi-use trail and pedestrian bridge. The installation of the trail will disturb a strip +-30' feet wide for the length of the trail (or approximately 1.0 acres). Project Location: The trail will be installed approximately 3,280' feet northwest of the Rodd Field Road/Yorktown Blvd., intersection in Corpus Christi, Texas. This specification shall govern for all work necessary to complete the clearing, grubbing and stripping as indicated by the drawings and as specified herein and shall include removing and disposing of all trees, stumps, brush, roots, logs, vegetation, rubbish and other objectionable matter from the project area.
Bid Results
Bridges / Tunnels
$596,340.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2021
August 12, 2021
Yorktown Blvd & Rodd Field Rd, Corpus Christi, TX
Related To This Project
Corpus Christi, TX
Bid Date: Mar 22 2022
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Apr 06 2022
Corpus Christi, TX
Bid Date: Apr 05 2022
Corpus Christi, TX
Bid Date: Mar 02 2022
Corpus Christi, TX
Bid Date: Apr 04 2022
Corpus Christi, TX
Bid Date: Jan 06 2022
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Sep 26 2023
Corpus Christi, TX
Bid Date: Oct 06 2021
Corpus Christi, TX
--
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Dec 16 2021
Corpus Christi, TX
Bid Date: Nov 01 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
