BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2021 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Hailey, Idaho. Completed plans call for site work for a 53,000-square-foot transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

As of August 26, 2021. The project has been awarded with the amount of $7,258,144.50. SUN - Runway, Taxiway and Apron Rehabilitation Description: Rehabilitate Runway 13-31, Taxiway B, and Aprons Rehabilitate Runway 13-31 consists of a mill and inlay of Runway 13-31, constructing 20 foot wide paved shoulders and a new blast pad on the Runway 13 end. Work also includes safety area grading and stormwater improvements. Civil work includes partial depth roto-milling of the runway pavement, removal of the runway edge and end lighting and signs, full depth excavation and construction of subbase and base course as well as stormwater and underdrain improvements. Other work includes installation of new runway edge and end lighting, reinstallation of runway signs on new foundations, installation of new runway weather information system, placement of HMA pavement, application of pavement markings and grooving the runway surface. Approximate civil quantities include 85,000 SY of Rotomilling, 21,000 CY of excavation, 12,000 CY of total aggregates, 21,600 tons of hot mix asphalt pavement, 1,000 LF underdrain pipe, 220,000 SF of pavement markings, 67,000 SY of pavement grooving. Approximate electrical quantities include 5,500 LF of conduit, 28,000 LF of 5kV conductor, 13,000 LF of counterpoise, 95 LED HIRL fixtures, and 100 two piece base cans. Taxiway and Apron Pavement Maintenance consists of pavement maintenance of the parallel Taxiway B, connecting taxiways and adjacent apron areas. The work includes surface preparation, crack sealing, fog sealing and pavement markings. Approximate quantities include 16,000 LF of crack sealing, 16,000 Gal of seal coat and 53,000 SF of pavement markings. Mill and Inlay Apron Pavement consists of asphalt removal, regrading and compacting existing base course, HMA pavement placement and pavement markings. Approximate civil quantities include 24,000 SY of pavement removal, 24,000 SY of regrading and compacting existing base, 5,500 tons of hot mix asphalt pavement and 1,200 SF of pavement markings. Relocate Perimeter Fence consists of demolition of existing perimeter fencing and gate and installing new perimeter fence and gate. Quantities include 725 LF of fence demolition, 1,725 LF of new fence installation and relocation of 1 vehicle gate.

Award

Transportation Terminals

$7,258,145.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
5
Bidding Soon
80
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.