BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2024 at 7:00 PM

Updated December 31, 2024

Site work and new construction of an educational facility in San Francisco, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

*As of December 30, 2024, initial work packages for this project has already started construction. Bid Package #2 is currently out for bid. No bid dates have been announced yet for future packages. San Francisco Public Utilities Commission ("SFPUC") announces a Request for Qualifications and Proposals ("RFQ&P") inviting California Class "B" General Building Contractors to simultaneously submit their qualifications for evaluation and submit a Proposal in response to this RFQ&P to perform pre-construction and construction services for Contract No. WD 2879R - City Distribution Division Campus at 2000 Marin ("CDD" or "Project"), using the Construction Manager / General Contractor project delivery method. Interested parties responding to this RFQ&P ("Applicants" or "Proposers") must be construction manager / general contractors ("CM/GCs") capable of performing preconstruction services and building construction services. The Estimated Total Direct Construction Cost is $225,000,000. 8.40% MBE; 1.60% WBE; 6.00% OBE; Written questions regarding the RFQ&P shall be directed to qbd@sfwater.org no later than 4:00 pm on Tuesday, February 1, 2022. Work shall comply with all applicable codes and regulatory agencies' standards having jurisdiction over the design, construction and operation of the Project. The scope of work will include the demolition of an existing structure and the new construction of offices, warehouse, industrial shops, parking garage, fueling station, and site improvements. The SFPUC will not consider any late submissions. Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds. For this project, as set forth in detail in the contract, the SFPUC will issue purchase orders incrementally as needed to fund project work over the duration of the project, which serves the functions of Controller certification and encumbrance of project funds available for payments. The Work shall be Substantially Complete within 1276 consecutive calendar + The Work shall be Finally Complete within 275 consecutive calendar days,

Under Construction

Educational

$225,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

29

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
193
Bidding Soon
3,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

December 2, 2024

Project location map

2000 Marin St, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.