Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Orange Park, Florida. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.
The Selected Contractor shall furnish, unless otherwise noted, all necessary permits, labor, equipment, and materials to complete the following: A. Mobilization/Demobilization, General Requirements, Bonds and Insurance. B. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. C. Site Work 1. Site Preparation 2. Erosion Control 3. Salvage: Prior to demolition of equipment or facilities, the Contractor shall coordinate with the Owner on any Owner designated equipment identified to be salvaged. Contractor shall move the identified equipment and/or materials to the warehouse located on-site. Salvage equipment includes, but is not limited to (the Owner reserves the right to salvage existing equipment not identified on this list): a. 400kW CAT Generator b. 2000 Gallon Fuel Tank c. The owner will be responsible for the removal for use elsewhere or proper disposal of the existing fuel within the 2000 gallon fuel tank. d. Alternate Bid Item: 50 hp service pumps e. Alternate Bid Item: 50 hp Motor 4. Demolition as shown on the drawings. 5. Site restoration including sodding and other restoration. Contractor agrees to restore as necessary, any systems that might be impacted during construction. Restoration of the project site to pre-construction condition. 6. Proper disposal of excess and unsuitable excavation and removal D. Mechanical Work 1. Replace the 400-kW generator with a new 500-kW Generator including exhaust piping and fuel lines. 2. Replace the 2000-gallon fuel tank with a new 4000-gallon fuel tank. 3. Alternate Bid Item: Replace the existing 50 hp service pumps 1, 2, and 3 in Pump Building No. 1 with 60 hp service pumps including associated valves, fittings, and appurtenances. Replace pump no 4 (Peerless Pump Model 6AE14G) 60 hp motor with an inverter duty rated motor. 4. Demolish the existing pressure manifold system in pump building 1 and install a new pressure manifold system and piping in pump building 2. E. Electrical Work 1. Installation of new offsite well pump number 2 electrical and instrumentation and controls. 2. Electrical, instrumentation and control work shall be constructed for an additional chemical feed pump. 3. Install new 60 hp rated VFDs in Pump Building 1 and 2. 4. Install a new Fiber optic cable to the existing warehouse for future remote monitoring. 5. Install a new motor control center (MCC) in pump Building 2 with a PLC panel. 6. Install new electrical for the new 500 KW generator in accordance with the manufacturer's standards. 7. Electrical, Instrumentation and Control work shall be constructed in accordance with CCUA Water Treatment Plant Standards, drawings, and specifications to provide a functional and integrated new electrical system. F. Conducting all necessary testing and start-up. G. Prepare Record Drawings. Intent to Bid Due Date Jul 29th 2021, 5:00 PM EDT Questions Due Date: Jul 15th 2021, 5:00 PM EDT
Award
Water / Sewer
$1,926,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2021
September 3, 2021
1082 Camp Francis Johnson Rd, Orange Park, FL
Related To This Project
Orange Park, FL
Bid Date: Sep 21 2021
Orange Park, FL
--
Orange Park, FL
Bid Date: Aug 04 2022
Orange Park, FL
--
Orange Park, FL
Bid Date: Feb 06 2023
Orange Park, FL
Bid Date: Jan 11 2024
Orange Park, FL
Bid Date: Mar 30 2023
Orange Park, FL
Bid Date: Jul 19 2021
Orange Park, FL
--
Orange Park, FL
--
Orange Park, FL
Bid Date: Jun 28 2021
Spencers Crossing Water Treatment Facility (WWTF) Clarifier No. 1 Foundation Stabilization - 4491309
Orange Park, FL
Bid Date: Aug 17 2022
Orange Park, FL
--
Orange Park, FL
--
Orange Park, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.