Published September 7, 2021 at 8:00 PM

Updated November 15, 2023

Site work and renovation of a water / sewer project in Mellen, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of Sept. 7, 2021, project was awarded to Howard Bros, Inc for $343,777.00. Notice to Proceed 8/31/2021. In general, the work consists of abandoning the existing sand filter/private onsite wastewater treatment system (POWTS) and replacing it with a conventional septic tank, pump station and pressure dispersal area. The work also includes replacement of plumbing fixtures; plumbing modifications to separate kitchen waste from bathroom waste and installing a holding tank; electrical service upgrades; replace building wiring, lighting and switches; asphalt paving, restoration, erosion control; and related work This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online. Base Bids will be received as a single lump sum bid for: 3) Plumbing and 5) Electrica No deposit is required to obtain documents for bidding purposes. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted.

Under Construction

Water / Sewer

$343,777.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
23
Bidding Soon
205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2021

August 31, 2021

Project location map

36764 Copper Falls Rd, Mellen, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.