Published September 1, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Montgomery, Pennsylvania. Completed plans call for site work for a water / sewer project.

The project will include the installation of approximately 1,000 LF of 8" ductile iron water main with appurtenances and the construction of a rechlorination facility, which includes installation of a 10'x18' fiberglass building, piping, pumps, appurtenances and electrical work. Project includes two contracts: Contract No. 1 - General Construction and Contract No. 2 - Electrical Construction. The Project includes the following Work: The project will include the installation of approximately 1,000 LF of 8" ductile iron water main with appurtenances and the construction of a rechlorination facility, which includes installation of a 10'x18' fiberglass building, piping, pumps, appurtenances and electrical work. Project includes two contracts: Contract No. 1 - General Construction and Contract No. 2 - Electrical Construction. Each bid shall be accompanied by a certified check or bid bond in the amount of 10 percent (10%) of the maximum amount of the bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated portal. Contact the Issuing Office, Larson Design Group, 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701, (570) 323-6603 between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, with any questions pertaining to access and use of the portal. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Other Requirements Bids shall be sealed in an opaque envelope and clearly marked as a bid for the Project. The envelope must also bear the name and address of the bidder. Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him/her. A Performance and Payment Bond, each in the amount of one hundred percent (100%) of the estimated contract price, shall be required from the Successful Bidder. The Supplementary Conditions set forth requirements for the payment by the Contractor and all Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by all applicable provisions of the PA Prevailing Wage Act, and the Bid shall be prepared accordingly. The Owner reserves the right to waive any irregularities and to reject any and all bids and to award either contract to the lowest responsible bidder for the total of all lump sum items. No bidder may withdraw his or her bid within sixty (60) days after the actual opening thereof. The Work will be substantially complete within 150 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 180 days after the date when the Contract Times commence to run. Award Details: Contract 1 - General Construction: M.R. Dirt Inc. $596,520 Contract 2 - Electrical Construction: M.R. Dirt Inc. $51,750

Award

Water / Sewer

$648,270.00

Public - City

Site Work

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
59
Bidding Soon
896
All Active Projects
380
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2021

September 8, 2021

img_map_placeholder

Multiple Locations, Montgomery, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Timber Run Water Service

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.