BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Webster City, Iowa. Completed plans call for site work for a water / sewer project.

The Edgewood Water Main Loop Project is located west of the City's Maintenance Facility. The address of the facility is 100 E Ohio Street, Webster City, IA. The project extends from the facility, southwest to Edgewood Drive. The project includes the installation of approximately 90 LF of trenched 12 PVC water main, 430 LF trenchless of 12 PVC or 14 HDPE water main, 120 LF of trenchless 12 PVC or 14 HDPE water main with steel casing, 120 SY of pavement removal and replacement, and a temporary access road. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Webster City, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Webster City. The bid shall contain no condition except as provided in the specifications. Notice is hereby given that a public hearing will be held by the City of Webster City, Iowa on the proposed Contract Documents (plans, specifications, and form of contract) and estimated total cost for the Edgewood Water Main Loop Project at its meeting at 6:05 P.M. on the 19 th day of July 2021, in said City Council Chambers, Webster City City Hall, 400 Second Street, Webster City, Iowa 50595. The Contractor shall substantially complete the project by November 19 th , 2021.The Contractor shall fully complete the project within 15 working days following substantial completion and notice to proceed. The City of Webster City does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Post-Bid

Water / Sewer

$340,000.00

Public - City

Site Work

12

6

2

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
36
Bidding Soon
562
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2021

August 9, 2021

img_map_placeholder

S Edgewood Dr, Webster City, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.