Site work for a civil project in Atlanta, Georgia. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

As of June 27, 2023, bids for this project are under evaluation. A timeline for award has not been confirmed. The area downstream from an existing 84" diameter roadway culvert at 980 Crest Valley Drive is experiencing streambank erosion. This project aims to protect the culvert, restore and armor the eroding stream banks, and replace other deteriorating components. The project consists of building a cast in place reinforced concrete headwall for the 84" culvert, replace the 18" pipe headwall with precast concrete headwall, and replace the last section of failing reinforced concrete pipe connected to the roadway storm system. Additionally, the damaged section of an 18" concrete storm pipe and the brick manhole within the right of way will be removed and replaced with new concrete pipe and pre-cast manhole with frame and cover. Through vehicular access and utility services during construction of this project shall be maintained. For detailed information, refer to the approved construction plans titled "980 Crest Valley Drive Drainage Improvement Project" prepared by Neelu, Inc. dated 4/6/2021 City of Sandy Springs Permit no. PW21-00005 dated 5/5/2021. The contractor must perform at least 51% of work, and must be Pre-qualified Prime Contractor listed by the Georgia Department of Transportation. Questions are due no later than September 20, 2021; 5:00 p.m. Questions received after this date and time may not be answered. The City of Sandy Springs reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Sandy Springs. Five percent (5%) bid bond required for this project. There is no City furnished equipment to be installed by the contractor. Questions are due no later than March 23, 2022; 5:00 p.m. Questions received after this date and time may not be answered.

Bid Results

Water / Sewer

$279,562.00

Public - City

Site Work

15

6

5

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
88
Bidding Soon
1,495
All Active Projects
655
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2022

May 30, 2022

img_map_placeholder

980 Crest Valley Dr NW, Atlanta, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.