Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 3, 2021 at 8:00 PM
Updated November 16, 2024
Site work and new construction of a mixed-use development in Butler, New Jersey. Working plans call for the construction of a municipal facility; for site work for a municipal facility; pre-engineered storage facility; and pre-engineered storage facility.
As of July 28, 2021, this project has not yet been awarded. A timeline for the award has not yet been established. Proposals shall be enclosed in opaque sealed envelopes, plainly marked, "PROPOSAL FOR ELECTRIC DEPT POLE BARN" and shall show the name and address of the bidder. Bids may be forwarded by certified mail. If mailed, the sealed envelope containing the proposal and marked as directed above, must be enclosed in another envelope properly addressed for mailing as follows: Mary O'Keefe, Borough Clerk Borough of Butler One Ace Road Butler, New Jersey All bids shall be presented to the Clerk by the parties bidding or their agents at the place and time designated or by mail as above. The Borough will not assume responsibility for bids forwarded through the mail if lost in transit at any time before bid opening. No bids will be received after the time set forth above. The Borough reserves the right to waive minor defects and informalities in any bid and to reject any and all bids, or to accept bids that are in the opinion of the Borough in the best interest of the Borough. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening of bids. Bidders are required to comply with the provisions of P.L. 1975, c. 127, and any amendments thereto, regarding Affirmative Action. The successful bidder, upon notification of the Borough's intent to award a contract to said bidder, must supply the Borough with one of the following Affirmative Action documents: 1. A photocopy of the bidder's Federal Affirmative Action Plan Approval Letter; or 2. A photocopy of the bidder's Certificate of Employee Information Report; or 3. The Borough's copy of the bidder's completed Affirmative Action Employee Information Report Form. The bidder's Affirmative Action documentation must be supplied to the Borough within ten (10) days of the bidder's notification of the Borough's intent to award. If the bidder fails to supply the Borough with the necessary Affirmative Action documentation, the Borough may declare the bidder non-responsive and award the contract to the next lowest bidder. Simultaneous with the submission of bids, the corporation or partnership so bidding shall furnish a statement setting forth the names and address of all stockholders in the corporation who own ten percent (10%) or more of the stock in any class, or of individual partners in the partnership who own ten percent (10%) or greater of interest therein pursuant to Chapter 33, P.L. 1977. Bids will be rejected if they do not contain this disclosure statement.
Final Planning
Warehouse / Distribution - Pre-Engineered Storage Building
$375,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2021
February 9, 2022
1 Ace Rd, Butler, NJ
Related To This Project
Butler, NJ
Bid Date: Mar 12 2025
Butler, NJ
Bid Date: Jun 24 2025
Butler, NJ
Bid Date: Aug 14 2025
Butler, NJ
Bid Date: Aug 28 2025
Butler, NJ
Bid Date: Oct 07 2025
Butler, NJ
Bid Date: Nov 14 2024
Butler, NJ
--
Butler, NJ
Bid Date: Aug 15 2024
Butler, NJ
--
Butler, NJ
Bid Date: May 01 2024
Butler, NJ
Bid Date: Apr 10 2024
Butler, NJ
Bid Date: Apr 10 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
