BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Spokane, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project was awarded on 7/20/2021 to Island Asphalt Co. in the amount of $1,333,333. COUNTY ROAD PROJECT for the improvement of 57th Ave from Perry St. to Mt. Vernon Rd. in Section 4 in Township 24 N, Range 43 E., W.M. by constructing ADA ramp retrofits, median island removal/construction, HMA grinding and paving, temporary pavement marking, project traffic control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The following is applicable to Federal-aid projects. The County of Spokane, in accordance with Title VI of the Civil Rights Acts of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-Assisted Programs of the Department of the Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin or sex in consideration for an award. BID DEPOSIT REQUIRED. No bid may be considered for public work unless it is accompanied by a bid deposit in the form of a surety bond, postal money order, case, cashier""'s check or certified check in an amount equal to five percent (5%) of the amount of the bid proposed. If the bidder to whom the contract is awarded fails to enter into the contract and furnish the contractor""'s bond as required within ten delays after notice of the award, exclusive of the day of notice, the amount of the bid deposit shall be forfeited to the County and the contract awarded to the next lowest and best bidder. If the bid deposit is """cash""" and is in the form of a postal money order, cashier""'s check or certified check the checks are to be made payable to the Spokane County Treasurer. Cash bid deposits are to accompanied by a completed Bid Deposit Form (see Appendix). Cash bid deposits of all unsuccessful bidders shall be returned after the contract is awarded and the required contractors bond and proof of insurance given by the successful bidder is accepted by the Board of County Commissioners. If the bid deposit is in the form of a surety bond it must be of a corporate surety licensed to do business in the State of Washington accompanied by a completed Bid Deposit Surety Bond Form (see Appendix). WARNING: If the bidder is to submit a bid deposit in the form of a Surety Bond, the County strongly recommends the use of the County Bid Deposit Surety Form contained in the appendix. Recent analysis has revealed that as many as 30% of the bid surety bonds submitted on public works projects are potentially fatally flawed as the contain qualifications to the 5% forfeiture penalty mandated by RCW 36.32.250. If the County Bid Deposit Surety Bond Form is not used, the bidder is warned to take special care in assuring that the language contained in the form used does not materially alter, qualify or conflict with the terms and conditions set forth in the County Bid Deposit Surety Bond Form, Bid Deposit Surety Form and RCW 36.32.250. Any such material alteration, qualification or conflict shall make the bid non-responsive and shall cause the bid to be rejected by the County. Bidders, (General Contractors, Sub-bidders and Suppliers) may obtain the project documents from the Spokane County""'s Plan Room, Digital files are available to bidders at no cost. Printed documents are available at bidder expense. The successful bidder will be required to file a performance bond in the full amount of the contract price which bond shall be furnished by a Surety Company acceptable to the Board of County Commissioners. The Board of County Commissioners reserves the right to reject any or all bids or any part of a single bid and to waive all informalities in the bidding. APPROVED BY THE BOARD this 22nd day of June 2021. Ginna Vasquez, Clerk of the Board Project Estimate: $1,000,000 - $1,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,333,333.00

Public - County

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
105
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2021

August 16, 2021

img_map_placeholder

Multiple Locations, Spokane, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.