Site work and paving for a mixed-use development in Gretna, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Installation of approximately 26,000 SY of 7" thick concrete pavement, approximately 2,200 LF of 8" DIP water main and appurtenances, approximately 7,150 LF of 8" PVC sanitary sewer on a 157 acre park site. If you have any questions, contact us at 402.934.3680. In order to bid the project, the contract documents must be issued directly by JEO Consulting Group, Inc. The work in this Section includes site dewatering necessary to lower and control groundwater level and hydrostatic pressure, and controlling the site drainage and surface water flows, to allow construction to be performed. It is required that the groundwater level be lowered and maintained at the level necessary to provide a substantially dry and stable grade to allow subsequent operations to be performed. The Contractor shall install all such dewatering equipment as may be necessary, throughout the duration of the project, to maintain the groundwater level, as required. Contractor is responsible for controlling discharge rate and the dewatering system's effect on the groundwater level. The Contractor shall intercept and divert site drainage and surface water flows away from excavations and trenches; using dikes, ditches, pipes, sumps, pumps or other means. The Contractor shall remove standing water from trench or excavation with sumps, pumps and piping or other means. It shall be Contractor's responsibility to select materials, methods, and equipment, and design a dewatering system which will: Provide a substantially dry and stable grade to allow subsequent operations to be performed. Effectively reduce the hydrostatic pressure and lower the groundwater level, as required. Not result in damage to adjacent properties, buildings, structures, utilities, private and public water wells, or other work, as a result of settlement, standing water or other groundwater-related effects. Dewatering operations shall be adequate to assure the integrity of the finished project. The responsibility for conducting the dewatering operation in a manner, which will protect adjacent structures and facilities, rests solely with Contractor. The cost of repairing any damage and/or the restoration or replacement of adjacent structures and facilities that are damaged as a result of the dewatering operations shall be the sole responsibility of Contractor. The Contractor shall be solely responsible for the design, installation, operation, maintenance, monitoring, and removal of the dewatering system.

Award

Sidewalks / Parking Lot

$2,457,207.00

Public - City

Paving, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
42
Bidding Soon
484
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2021

September 1, 2021

img_map_placeholder

To Be Determined, Gretna, NE


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.