Site work and paving for a road / highway in Glendale, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of September 16,2022 this project has not yet been awarded. The project is expected to be awarded on September 27, 2022.** This project will consist of the reconstruction of Cactus Road between 59th to 67th Avenues including the intersection at 67th Avenue. This project will include removal of all pavement, ABC and asphalt pavement. This project will also include striping and some signage. BID SECURITY: Each proposal shall be accompanied by a proposal guarantee in the form of a certified or cashier's check or bid bond, with a properly executed Power of Attorney attached, in an amount equal at least to ten percent (10%) of the proposal payable without condition to the City. If a bid bond is submitted with the bid it shall be issued by a company licensed with the Arizona Department of Insurance and authorized to issue such bonds in this state. NO BONDS ISSUED BY INDIVIDUAL SURETIES WILL BE ACCEPTED. The company issuing the bid bond shall have a rating of not less than A- in the BEST rating available at the time this project was let to bid. The proposal guarantee shall guarantee that the bidder, if awarded the contract, will, within ten (10) working days after the award, execute such contract in accordance with the proposal and in manner and form required by the contract documents, and will furnish good and sufficient bond for the faithful performance of the same, a payment bond and a certificate of insurance. The bid securities of the three (3) lowest bidders will be retained until the contract is awarded, or other disposition made thereof. The bid securities of all bidders, except the three (3) lowest, will be returned promptly after the canvass of bids. In the event the Contractor fails, within ten (10) working days after the award, to execute said Contract and deliver the Performance and Labor and Material Payment Bonds and the Certificate of Insurance, the Bid Security shall become the property of the City. Upon receipt of notice of the acceptance of this bid, we will execute the formal contract attached within ten (10) days, and will deliver a one hundred percent (100%) Performance Bond for the faithful performance of this Contract, together with a one hundred percent (100%) Payment Bond and Certificate of Insurance. TIME OF COMPLETION: The Contractor shall commence work under this project on or before the tenth day following receipt of the Notice to Proceed for that project from the City of Glendale and shall fully complete all work under the project within one hundred and twenty (120) consecutive calendar days from and including the date of receipt of such Notice to Proceed. Time is of the essence in the completion of all work required under this contract. The Contractor shall, at all times, during the continuance of the contract, prosecute the work with such force and equipment as is sufficient to complete all work within the time specified. If any person contemplating a bid for proposed contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed contract documents, or finds discrepancies in or omissions from the plans and specifications, he may submit to the Engineering Department, a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. Questions received less than ninety-six (96) hours before the bid opening time may not be answered. Any interpretation or correction of the documents will be made only by Addendum, duly issued and a copy of such Addendum will be mailed or delivered to each person receiving a set of such documents. The City of Glendale will not be responsible for any other explanations or interpretations of the proposed documents. The City of Glendale is an equal opportunity employer and minority business enterprises and women business enterprises are encouraged to submit bids. The City of Glendale reserves the right to reject any or all bids or waive any informality or irregularity in a bid. Bidders that have an open litigation with the city of Glendale will not be considered for additional work until litigation is resolved. No bidder may withdraw his bid for a period of fifty (50) days after opening and reading of the bids.

Bid Results

Roads / Highways

$4,289,065.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
22
Bidding Soon
723
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

September 19, 2022

img_map_placeholder

W Cactus Rd, Glendale, AZ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.