BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Houston, Texas. Completed plans call for the renovation of a educational facility.

Renovation of Lois J. Moore Building for the Harris County Hospital District dba Harris Health System Contact Information: Melissa McCord, melissa.mccord@pur.hctx.net Questions Due Date: Aug 4th 2021, 12:00 PM CDT Persons with disabilities requiring special accommodations should contact the purchasing office at (713) 274-4400 at least two (2) days prior to the pre-proposal conference. Individual bid bond payable to Harris County for 5% of the total amount of each separate bid Dollar value of the following, as a percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent. 1) Labor. 2) Materials. 3) Equipment. Work shall begin on the date fixed in the Notice to Proceed and be substantially complete within 120 calendar days after the Notice to Proceed Date. The Owner will suffer financial loss if the Work is not completed within the time specified herein, plus any extension thereof allowed in accordance with paragraph 5.7 of the General Conditions. The Owner and the Contractor recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by the Owner if the work is not complete on time. Accordingly, instead of requiring any such proof, the Owner and the Contractor agree that as liquidated damages for delay (but not as a penalty) the Contractor shall pay the Owner Two Hundred and Fifty dollars ($250.00) for each day that expires after the time specified herein for completion until the Work is complete. In case full payment for the Work shall have been made, the Owner shall have the right to recover from the Contractor and the Contractors surety the amount of such liquidated damages as determined under this Contract.

Award

Educational

$1,537,658.00

Public - County

Renovation

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
71
Bidding Soon
2,706
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2021

September 22, 2021

img_map_placeholder

8901 Boone Loop Rd, Houston, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.