Site work and paving for a mixed-use development in Juneau, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of January 26, 2023, construction commenced in Summer, 2022, however, an exact timeline for construction has not been confirmed. The work for which bids are asked includes the following approximate quantities: 980 l.f. of 10 inch diameter sanitary sewer replacement and laterals; 980 l.f. of 8 inch diameter water main replacement and laterals; 760 l.f. of storm sewer replacement (sizes ranging from 6 inch to 48 inch diameter); 2,790 l.f. of concrete curb & gutter; 13,240 s.f. of concrete sidewalk; 44,450 s.y. of asphaltic roadway; as well as spot driveway replacement, site grading/earthwork, surface restoration, cleanup, and related miscellaneous construction. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Jason M. Laue, 201 Corporate Drive, Beaver Dam, WI 53916. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Federal wage rates. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. OWNER reserves the right to waive any informalities or to reject any or all bids.

Under Construction

Sidewalks / Parking Lot

$1,022,762.00

Public - City

Paving, Site Work

34

21

5

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
856
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

July 25, 2022

img_map_placeholder

Multiple Locations, Juneau, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.