Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 22, 2021 at 8:00 PM
Updated September 15, 2023
Renovation of a pre-engineered storage facility in New York, New York. Completed plans call for the renovation of a 10,000-square-foot pre-engineered storage facility.
**As of September 22, 2021 the project has not been awarded. A timeline for the award is not yet established.** Addendum 2 states that bid date has changed from 7/23/21 at 1:00pm to 8/6/21 at 1:00pm. Also there will be another mandatory pre bid meeting on 7/26/21 at 10:00am at the Sloatsburg Tandem Lot, MP 32. If you attended the first mandatory pre bid meeting on 7/12/21 at 10:00am you do not have to attend the one on 7/26/21 at 10:00am The NYS Thruway Authority has the need for materials and work required to replace a roof on the salt shed at the Suffern Tandem Lot at Milepost In accordance with the New York State Thruway Authoritys commitment to increase opportunities for certified [Minority-owned, Women-owned, and/or Service-Disabled Veteran-owned] businesses and pursuant to its discretionary purchasing authority under Public Authorities Law , the Thruway intends to procure materials and work required to replace a roof on the salt shed at the Suffern Tandem Lot at Milepost (MP) . Service-Disabled Veteran-Owned Set Aside: No Contract term: The contract shall be prompt completion, weather permitting. TEM 1: Metal Roof Replacement-Suffern Tandem Lot Salt Shed Suffern Tandem Lot, MP 32.1/I-87 Latitude 41.14379 Longitude -74.17884 Roof area is approximately is approximately 10,000 sq. ft. Furnish and install American Building Components (ABC) Roofing Imperial Rib metal roof or equivalent. Gauge: 29 Color: Ivy Green Texture: Smooth (standard) Finish Type: Siliconized Polyester Coatings: Galvalume Plus(R) Repair and/or replace damaged decking as required and authorized in writing by the Project Manager. Materials to be consistent with the existing deck. Replacement decking will be paid for at the contractor's pricing for replacement cost. Underlayment: Furnish and install underlayment and ice and water barrier as recommended by the roofing manufacturer and according to applicable codes. Furnish manufacturer's standard written warranty on roofing installed.
Bid Results
Warehouse / Distribution - Pre-Engineered Storage Building
$124,480.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2021
August 23, 2021
To Be Determined, New York, NY
Related To This Project
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Oct 28 2022
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Jun 17 2022
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
