BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a water / sewer project in Abilene, Texas. Completed plans call civil work for a water / sewer project.

As of August 18, 2021, the project has not yet been awarded. A timeline for award not yet been established. The project includes the installation of approximately 18,500 linear feet of 30" water line, bores, fittings, valves, fire hydrants, waterline connections, pavement repair, traffic control, SWPPP, and appurtenances. The project begins near the intersection of Rebecca Lane and Ridgemont Drive, continues along Rebecca Lane and Arnold Boulevard, ending near the intersec for PVC pipe and alternate bid for ductile iron pipe.tion of Arnold Boulevard and Jennings Drive. The project includes a base bid The time to be allowed under this Contract to complete all work is 260 working days.

Bid Results

Water / Sewer

$7,295,724.00

Public - City

Paving, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
19
Bidding Soon
196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2021

September 20, 2021

Project location map

Multiple Locations, Abilene, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.