BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2021 at 8:00 PM

Updated November 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Ann Arbor, Michigan. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 13, 2021 This project has not yet been awarded. A timeline for award has not yet been established.** Washtenaw County Parks and Recreation Commission (WCPARC) is issuing a Request for Proposal (RFP) for three separate projects located at Nelson Meade County Farm Park and the Meri Lou Murray Recreation Center. The County might award all projects under one contract, or separately award to multiple contractors individually or in any combination thereof as it determines to best meet the County's needs, interests, and specifications. The first project involves reconstruction of a 60 car parking lot and expansion with an additional 26 vehicle spaces at Nelson Meade County Farm Park. Work will entail Soil Erosion Control Measures, vegetation removal, soil excavation and grading, stormwater infrastructure renovations, asphalt and concrete removal, HMA paving, concrete flatwork and curbing, miscellaneous site amenities, tree planting, and site restoration. The second area of work is located at the Meri Lou Murray Recreation Center. It provides expansion of the parking lot with 23 new parking spaces. This project includes similar element as identified above and incorporates an underground detention systems to capture stormwater runoff as a result of the increased impervious surfacing. The third project is replacement of roughly 2400 lineal feet, of an existing 8 feet asphalt pathway located along Washtenaw Avenue from Manchester Avenue to Platt Road. This work will include pulverization in place of existing materials and resurfacing with new HMA. An owner's option alternative will be for full removal of the existing bituminous pathway prior to paving. There will also be minimal concrete flatwork. Work task throughout will include, but are not limited to: Demolition or removals: existing concrete curbing and sidewalk segments existing asphalt surfaces - complete removal & milling wooden split-rail fencing miscellaneous trees and vegetation 12" CMP stormwater pipe and associated outlet control structure Relocations: security gate system bike racks light poles tree transplanting Additions: regrading/earthwork for detention basin increased capacity and construction of new parking spaces and sidewalks new HMA materials new limestone base materials new concrete sidewalks new concrete driveway approach new concrete curb and gutter new 12" CMP stormwater pipe and outlet control structure new underground stormwater detention chambers parking stall line striping and ADA symbols and signage tree plantings native seed mix installation in detention basin turfgrass seeding and restoration soil erosion control measures Question Acceptance Deadline 07/23/2021 12:00 PM EDT Questions are submitted online No

Award

Sidewalks / Parking Lot

$628,986.00

Public - County

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
205
Bidding Soon
2,553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2021

August 30, 2021

Project location map

Multiple Locations, Ann Arbor, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.