BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Superior, Wisconsin. Completed plans call for site work for a water / sewer project.

Project: The City of Superior, Wisconsin is requesting sealed bids from qualified contractors to perform work at Fraser Shipyards Dry Dock No. 2. The Work generally consists of pumping system and electrical modifications for Dry Dock No. 2 at Fraser Shipyards in Superior, Wisconsin. The pumping system includes two new pumps with associated electrical, piping, pipe supports, pipe protection, and grading. The electrical modifications include disconnect replacement and additional lighting which are included as optional work items. This project is grant funded by the Wisconsin Harbor Assistance Program. All bids must be prepared on the form provided and submitted in accordance to the Instructions to Bidder. The contractor shall submit a list of its subcontractors as a part of its proposal, which list shall not be added to or altered without the written consent of the City of Superior, and as specified in 66.0901 Wisconsin Statutes. The City of Superior encourages the participation of women and minority owned businesses. The City of Superior reserves the right to reject any or all bids, to waive irregularities, or to accept such bids, as in the opinion of the City, will be in its best interests. The Contractor shall perform everything required to be performed and shall provide and furnish all the applicable labor, materials, equipment, necessary tools, expendable equipment, insurance provided by the specifications, contributions to social security and all utility and transportation services required to perform and complete in a workmanlike manner the following work: Pumping system and electrical modifications for Dry Dock No. 2 at Fraser Shipyards in Superior, Wisconsin. The pumping system includes two new pumps with associated electrical, piping, pipe supports, pipe protection, and grading. The electrical modifications include disconnect replacement and additional lighting which are included as optional work items.

Post-Bid

Water / Sewer

$135,000.00

Public - City

Site Work

16

15

2

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
108
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2021

August 30, 2021

img_map_placeholder

1 Clough Ave, Superior, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.