BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and addition to a mixed-use development in Pickering, Ontario. Conceptual plans call for the construction of a 50,000-square-foot, two-story above grade clubhouse / community center; 45,000-square-foot, two-story above grade, two-story below grade, 435-space library; 40,000-square-foot, two-story above grade, one-story below grade, 120-space theater / auditorium; for the addition of a 38,000-square-foot, two-story above grade municipal facility; two-story above grade, two-story below grade, 300-space parking garage; and four-story below grade, 400-space parking garage.

The Pickering City Centre Project consists of the following: **Phase 1 - Park - now covered under a separate report. Phase 2 - Relocate the Bell vault, move Esplanade South, construct the integrated 45,000 sq ft Library and SYC, sell air rights for residential development, construct below grade parking for both (Design in 2027, construction 2028) Net Project Cost $116.3 million). Phase 3 - Update the City Hall façade, renovate the current Library site for administrative expansion (2029, Net Project Cost $16 million). Phase 4 - Construct the PAC (Pickering Arts Centre), update the CHRDC (Chestnut Hill Developments Recreation Complex) façade, construct below grade parking, and construct new CHDRC parking (2030-2031, Net Project Cost $115.5 million). TIMELINE: Scope of work & timelines have changed. KPMG to conduct a detailed analysis of the preferred option. This scope of work will include the design of facility floorplates to fully consider program requirements; stakeholder and financial analysis, and provide recommendation on preferred partnership and governance structures. An RFP for engineering design for Phase 1 - Park has been issued under a separate report. Phase 2 has been deferred to 2028 upon the completion of the Seaton Recreation Complex & Library. Updates may be available spring 2025.

Conceptual

Clubhouse / Community Centers

$244,300,000.00

Public - City

Addition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
121
Bidding Soon
2,596
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2021

September 4, 2028

img_map_placeholder

Glenanna Rd, Pickering Prkwy, Valley Farm Rd, Pickering, ON

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.