BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2021 at 8:00 PM

Updated August 14, 2025

This is a service / maintenance or supply contract in Winter Garden, Florida. Contact the soliciting agency for additional information.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Expanded Letter of Response Professional Liability Insurance : $500,000.00 CEI Svcs for Resurface/Safety Impr Western Beltway MP 0-11 TRC Members (Subject to Change) : Ellis Benoit Joseph Chinelly Rachel Panchookian Construction Engineering and Inspection Services for Resurface and Safety Improvements Western Beltway, MP 0-11. The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. The Construction Project Manager is Fernando Gomez. Florida's Turnpike held Consultant Marketing Sessions for this project on June 24, 2021 as scheduled. Consultants interested in responding to this advertisement should adhere to the Department's Response Procedure shown above. The Standard Form page count does not include the reference documents of: 1. staff hours on a summary sheet (showing the available hours, proposed manhours, commitments to other projects, projects staff are proposed on and residence location of each team member proposed for this project), 2. organizational chart 3. Qualification Matrix (Showing CTQP certifications, other certifications, etc.). Each of the 3 reference documents should be on separate pages. Resumes should be arranged alphabetically, by last name, regardless of firm name. Resumes should include a TIN number, a Financial Project ID Number, a brief description of experience and responsibilities, project start and end dates and reference contact names and phone numbers. Financial Management Number(s) 440289-1-62-01 & 440290-1-62-01 Longlist Date/Time 7/29/2021 Shortlist Selection Date/Time 8/06/2021 Final Selection Date/Time 8/26/2021 Negotiations Period Begin Date 8/28/2021 Negotiations Period Ending Date 1/04/2022 FDOT - RFP - CEI Svcs for Resurface/Safety Impr Western Beltway The method of contractor selection has not been determined at this time.

Award

Roads / Highways

$1,800,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
10
Bidding Soon
1,705
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.