Site work and new construction of a mixed-use development in Fort Benning, Georgia. Completed plans call for the construction of a 92,000-square-foot military facility.
Contract Award Date: Dec 16, 2022 Contract Award Number: W912HN23C3001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: SBVUVJ2G3NL4 Contractor Awarded Name: SAUER CONSTRUCTION, LLC Contractor Awarded Address: Jacksonville, FL 32216-0952 USA Base and All Options Value (Total Contract Value): $63895000.00 As of December 5, 2022, a bid tabulation has not been published and the project has not been awarded. A timeline for award has not been confirmed. Description: PN92792 SOF Battalion Headquarters Construct a non-standard Battalion Operations Facility (approximately 92,000 SF) for a newly formed 75th Ranger Battalion at Fort Benning, GA. Primary facilities include administrative areas, operations area with a Sensitive Compartmented Information Facility (SCIF), a Ranger Operations Center (ROC), and Company Operations Facilities/Readiness Bays. Construction includes mechanical and electrical systems, information systems, fire protection and alarm systems, Intrusion Detection System (IDS), and Energy Monitoring Control Systems (EMCS).Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Period of Performance: 740 Calendar Days In accordance with DFARS 236.204(ii), the magnitude of construction for this project is between $25,000,000 and $100,000,000 .Evaluation Criteria: The contract will be solicited and procured via FAR Part 15 Contracting by Negotiation, Lowest Price Technically Acceptable (LPTA). GENERAL: This section comprises an explanation of the bid items identified in the bid schedule for each item of work. The Contractor shall bid the work under the applicable bid item for the specific areas identified in the bid schedule. All work specified herein shall be accomplished in accordance with the requirements of the technical provisions of the specifications and the contract drawings. 0001 Base-Construction SOF Battalion HQs to the 5-Ft Line, Complete. Furnish and install all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the SOF Battalion Headquarters in accordance with the solicitation documents. This line item shall include applicable power and pathway infrastructure for equipment, such as the audio-visual equipment, access control, and security systems. 0002 Base-Site Development and Hardstand, Complete. Furnish and install of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the site development, hardstand, and utilities in accordance with the solicitation documents. This CLIN does not include privatized utilities that are being designed and/or installed by others. Work shown to be completed by others is not in contract. 0003 Option 1 - Pedestrian Bridge and Vehicle Charging Stations, Complete. Provide a fully engineered clear span bridge of welded steel construction, and fully engineered concrete foundation system in accordance with the solicitation documents. Provide Electric Vehicle Charging Stations encompassing the conductors, including the ungrounded, grounded, and equipment grounding conductors and the electric vehicle connectors, attachment plugs, and all other fittings, devices, power outlets, or apparatus installed specifically for the purpose of delivering energy from the premises wiring to the electric vehicle (EV) in accordance with the solicitation documents. 0004 Option 2 - Escorts During Construction. Provide guard and escorts, and follow the procedure as noted in accordance with the solicitation documents to include Specification 01 14 00 Section 1.4.3.2 and 1.4.3.3 Escorts. A guard is required at the entrance of the construction site from the start of construction through the final acceptance by the Government. Another guard is required at the entrance of the S-2 Secure Area once the area is enclosed on exterior surfaces and prior to the start of interior rough-in in the S-2 Area until final acceptance by the Government. Escorts shall have line of sight to each worker within the S-2 Secure Area. Adjust the number of escorts or the number of workers as needed. 0005 Option 3 - Procurement and Installation of Furniture, Fixtures and Equipment. Procurement and Installation of Furniture, Fixtures & Equipment (FF&E) Package as listed Appendix U Furniture FF&E Procurement Data Sheets of the Comprehensive Interior Design. 1. PRE-AWARD INFORMATION: This Acquisition will be solicited using FAR part 15, Contract by Negotiation and is Full and Open Competition. The resultant Contract will be a Single, Firm Fixed-Price Contract for Project Number: PN92792 SOF Battalion Headquarters Fort Benning, GA. 2. BASIS FOR AWARD: Contract shall be awarded to the lowest priced technically acceptable responsive and responsible, contractor. PRIOR TO AWARD, IN ORDER TO BE DETERMINED RESPONSIVE AND RESPONSIBLE, A PROSPECTIVE OFFEROR MUST FURNISH THE FOLLOWING INFORMATION WITHIN THE ELECTRONICALLY SUBMITTED PROPOSAL:Standard Form 1442, completed and signed by an authorized person. Unit and Total Pricing for all line items in the bid schedule. (except CLINS marked "DO NOT BID THIS CLIN.") Failure to do so may result in rejection of an Offeror's proposal. Proposal Data Sheet (including DUNS and CAGE). Offerors are required to submit a bid guarantee for this project in accordance with FAR Clause 52.228-1, Bid Guarantee. An electronic copy of the bid guarantee must be submitted with the electronic proposal submission. Current Financial Statements (e.g. the last three years of financial statements, Annual Reports, Dun and Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. (The financial statement information will be protected from disclosure by the Contracting Officer.) Please note that the Offeror, shall submit a subcontracting plan pursuant to FAR 52.219-9 Alt II and AFARS Appendix DD (For Large Businesses Offerors only). It is required to be submitted with the proposal submission. Any applicable Teaming Agreements. prospective contractors submitting as a joint venture must provide the legal agreement forming the joint venture. Refer to Attachment 1 for additional guidance on the use of the PIEE Solicitation Module. For addition information on PIEE Vendor Access Instructions or PIEE Solicitation Module Frequently Asked Questions visit: https://dodprocurementtoolbox.com/site-pages/solicitation-module For additional instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf SOLICITATION NO.: W912HN22R3004 TITLE OF PROJECT: Project Number: PN92792 SOF Battalion Headquarters Fort Benning, GA. OFFEROR INQUIRY KEY: KGPQBX-WCCXK6 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Addendum #1-6 have been issued as of 4-29-2022.
Award
Military
$63,895,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2022
August 22, 2022
To Be Determined, Fort Benning, GA
Related To This Project
Fort Benning, GA
Bid Date: Jul 30 2019
Fort Benning, GA
--
Fort Benning, GA
Bid Date: Mar 02 2023
Fort Benning, GA
Bid Date: Feb 27 2023
Fort Benning, GA
Bid Date: Mar 07 2023
Fort Benning, GA
Bid Date: Sep 08 2021
Fort Benning, GA
Bid Date: Mar 22 2023
Fort Benning, GA
Bid Date: Mar 20 2023
Fort Benning, GA
Bid Date: Aug 17 2023
Alpharetta, GA
Bid Date: Dec 05 2019
Cleveland, GA
Bid Date: Dec 15 2022
Gainesville, GA
Bid Date: Dec 30 2022
Newnan, GA
Bid Date: Jan 10 2023
Atlanta, GA
Bid Date: Dec 20 2022
Covington, GA
Bid Date: Dec 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.