BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2021 at 8:00 PM

Updated November 20, 2025

Site work and paving for a mixed-use development in Coon Valley, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of Aug 24, 2021, the project has been awarded to Haas Sons Inc. $643,927.17. The start and completion date as not yet determined. Sealed bids, submitted in accordance with the Invitation for Bids for City Wide Street and Utility Reconstruction, Work for which bids are requested includes 1,420 of street reconstruction consisting of clearing and grubbing, removal of bituminous pavement, removal of curb and gutter, removal of concrete sidewalk, removal of concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete sidewalk, concrete driveway approaches, retaining walls, asphaltic concrete pavement, and boulevard restoration. 5% bid security is required. For questions regarding this project contact the Purchasing office, 203 S. Farwell Street, P.O. Box 5148, Eau Claire, WI 54702- 5148, telephone (715) 839-4957. Scope of work: Harless Road, from Drier Road west 300 feet. Reconstruction of Harless Road shall consist of removing the existing bituminous surface, sanitary sewer and services, water services, unclassified excavation, grading and graveling, concrete driveway approaches, asphaltic concrete pavement, and boulevard restoration. 2nd Street, from Cedar Street to Fountain Street. Reconstruction of 2 nd Street shall consist of removing the existing bituminous surface, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway approaches, concrete sidewalk, retaining walls, asphaltic concrete pavement, and boulevard restoration. Cedar Street, from 2nd Street to 1st Street. Reconstruction of Cedar Street shall consist of removing the existing bituminous surface, removal of concrete curb and gutter, removal of concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway approaches, concrete sidewalk, asphaltic concrete pavement, and boulevard restoration. Barbara Jean Drive, from Brookline Avenue east 350 feet. Construction of Barbara Jean Drive shall consist of sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway approaches, concrete sidewalk, asphaltic concrete pavement, and boulevard restoration. All improvements to be constructed under Contract 2021-19 shall be completed by Friday, October 22, 2021. The Contractor shall maintain a continuous effort to complete the project once construction has commenced.

Award

Sidewalks / Parking Lot

$643,927.00

Public - City

Paving, Site Work

16

6

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
60
Bidding Soon
482
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2021

August 26, 2021

Project location map

Multiple Locations, Coon Valley, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.