Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 15, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Urbandale, Iowa. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Reconstruct water main along Monroe Court between 70th street and 72nd street in Urbandale, IA. Contractor shall furnish all labor, materials and equipment required for installing 1,270 Linear Feet (LF) of 8" PVC (trenched), with associated valves, hydrants, fittings, and service lines as outlined in the bid documents. This includes removal and replacement of sidewalk, driveways, and concrete pavement; erosion control, traffic control, utility exploration, finish grading, sod placement, and other miscellaneous items described in the bid documents. Site Address: Monroe Court between 70th & 72nd Street Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the UWU, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the UWU. The bid shall contain no condition except as provided in the specifications. Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the Urbandale Water Utility and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the UWU from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of four (4) years from and after acceptance of the Contract. Question Deadline 03/27/2025 Submit all questions to Snyder & Associates, Inc. via email to ckahlsdorf@snyder-associates.com or call 515-964-2020. All questions shall be submitted to Snyder & Associates, Inc. a minimum of five business days prior to the bid letting date The Contractor shall substantially complete the project by October 31, 2025. Substantial completion includes having the water main installed and fully operational, parking lot and roadway granular surfacing completed, and ALL temporary erosion control measures are in place. Any delays due to weather, change orders, overruns of quantities, utility delays, or any other delays will not be considered as justification to modify the calendar date. Should the Contractor fail to substantially complete the work by the substantial completion date, liquidated damages of Five Hundred Dollars ($500) per calendar day shall be applied for each calendar day after the substantial completion date, until the project is substantially completed. The Contractor shall fully complete the project by November 28, 2025, as weather conditions allow. Fully complete shall be defined as surface restoration being completed and all improvements being ready for final acceptance. Should the Contractor fail to fully complete the work by the completion date, liquidated damages of Five Hundred Dollars ($500) per calendar day shall be applied for each calendar day after the completion date is charged until project is fully completed *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
GC Bidding
Water / Sewer
$401,700.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
Monroe Ct, Urbandale, IA
Related To This Project
Urbandale, IA
Bid Date: Jan 22 2025
Urbandale, IA
Bid Date: Jul 16 2024
Urbandale, IA
Bid Date: Jan 29 2025
Urbandale, IA
Bid Date: Jul 11 2024
Urbandale, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.