BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Price, Utah. Conceptual plans call for the construction of a municipal facility; and warehouse / distribution facility.

The SEUALG has outgrown the space available and intends to construct a new administration building, weatherization warehouse, food bank and transit hub. New SEUALG buildings key features are as follows: The new SEUALG buildings will be located near the Carbon County Fairgrounds Complex. The administration building, warehouse, food bank and transit hub will be located on a 4.04-acre parcel with flat ground and utilities located nearby. The administration building will be approximately 13,000 - 14,500 SF. The administration building will include a fully finished main level. Approximately 35 office spaces will be needed on the main floor as well as two small conference rooms, one large conference room, break room, reception area, restrooms, copy room, etc. Parking lot with approximately 80 spaces for administrative building. The weatherization warehouse, food bank and transit hub will consist of a separate 8,000 - 10,000 SF building. The warehouse will include two large bays for vehicle storage, office spaces, restrooms, and warehouse space. Parking lot with approximately 40 spaces for food bank, weatherization warehouse and transit hub. Loading dock for tractor trailers for the delivery of food. The construction budget is not to exceed $6.9 million. Proposals will be presented during the August SEUALG Governing Board Meeting on August 26, 2021. The SEUALG Governing Board may not elect to accept a proposal at the board meeting on August 26, 2021. SEUALG reserves the right to modify the following schedule at its discretion: Activity Date Site Visit July 22, 2021 at 11:00 am Question & Answer Deadline July 27, 2021 Proposal Due Date August 3, 2021 by 5:00 pm Awarding of Proposals August 26, 2021 Anticipated Notice of Award September 1, 2021 Anticipated Design Duration 3 Months Anticipated Construction Duration 10 Months As of July 13, 2021, The method of contractor selection has not been determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Municipal

$6,900,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
162
All Active Projects
87
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2022

img_map_placeholder

375 S Carbon Ave, Price, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.