Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a water / sewer project in Rankin Inlet, Nunavut. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Question Deadline 05/11/2026 Questions Regarding This Rft Should Be In Writing And Received By The Buyer At Least 5 Working Days Before The Tender Close Date And Time. The project consists of delivering a fully integrated, water treatment facility to replace the community's existing treatment system. The Contractor will be responsible for the complete supply, transportation to site, construction, installation, testing, commissioning, and two-year operation of the new facilities. Decommissioning of the existing water treatment plant at Williamson Lake and Nipissar Lake is considered provisional scope. Tear down of the existing water storage tank at Williamson Lake is included as part of this scope. The new system will include replacement of the raw water intakes at Nipissar Lake; including supply and installation of a new modular raw water pumphouse and associated equipment and infrastructure as well as upgrades and connections to the existing utilidor network. This also includes supply and installation of a new pre-engineered water treatment plant at Williamson Lake. Including fully integrated water treatment equipment incorporating straining, dissolved air flotation, ultrafiltration, UV disinfection, and truck-fill capability, new treated water storage tanks, mechanical and electrical systems, including backup power and associated works, instrumentation, controls, and all required civil and structural works. The work includes, but is not limited to: 1 Supply and installation of a modular pumphouse at Nipissar Lake; 2 New raw water intake structure including; pumps, piping, and screen; 3 Utilidor upgrades and connections; 4 Supply and construction of a pre-engineered WTP building at Williamson Lake; 5 New truck fill arm and access platform; 6 New water storage tanks; 7 New fuel tanks; 8 New electrical services, distribution, lighting, communications, and standby power systems; 9 New building mechanical systems; 10 New instrumentation and controls; 11 New skidded water treatment equipment from a single vendor including straining, DAF, UV disinfection, and UV; 12 Utility connections 13 Yard piping 14 New foundations including thermosyphons 15 Site grading; 16 Commissioning of the completed works 17 Two-year operation of the completed works Documents can be obtained from https://www.nunavuttenders.ca/
GC Bidding
Water / Sewer
$10,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2026
July 21, 2026
Multiple Locations, Rankin Inlet, NU
Related To This Project
Rankin Inlet, NU
--
Rankin Inlet, NU
Bid Date: Feb 14 2023
Rankin Inlet, NU
Bid Date: Jan 13 2023
Rankin Inlet, NU
Bid Date: Apr 06 2022
Rankin Inlet, NU
Bid Date: Apr 06 2022
Rankin Inlet, NU
Bid Date: Aug 03 2021
Rankin Inlet, NU
Bid Date: Apr 19 2022
Rankin Inlet, NU
Bid Date: Jan 11 2022
Rankin Inlet, NU
Bid Date: May 27 2021
Rankin Inlet, NU
Bid Date: Mar 17 2023
Rankin Inlet, NU
Bid Date: Oct 11 2022
Rankin Inlet, NU
Bid Date: Dec 13 2023
Rankin Inlet, NU
Bid Date: Oct 14 2022
Rankin Inlet, NU
Bid Date: Oct 21 2022
Rankin Inlet, NU
Bid Date: Oct 18 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
