BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a water / sewer project in Rankin Inlet, Nunavut. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 05/11/2026 Questions Regarding This Rft Should Be In Writing And Received By The Buyer At Least 5 Working Days Before The Tender Close Date And Time. The project consists of delivering a fully integrated, water treatment facility to replace the community's existing treatment system. The Contractor will be responsible for the complete supply, transportation to site, construction, installation, testing, commissioning, and two-year operation of the new facilities. Decommissioning of the existing water treatment plant at Williamson Lake and Nipissar Lake is considered provisional scope. Tear down of the existing water storage tank at Williamson Lake is included as part of this scope. The new system will include replacement of the raw water intakes at Nipissar Lake; including supply and installation of a new modular raw water pumphouse and associated equipment and infrastructure as well as upgrades and connections to the existing utilidor network. This also includes supply and installation of a new pre-engineered water treatment plant at Williamson Lake. Including fully integrated water treatment equipment incorporating straining, dissolved air flotation, ultrafiltration, UV disinfection, and truck-fill capability, new treated water storage tanks, mechanical and electrical systems, including backup power and associated works, instrumentation, controls, and all required civil and structural works. The work includes, but is not limited to: 1 Supply and installation of a modular pumphouse at Nipissar Lake; 2 New raw water intake structure including; pumps, piping, and screen; 3 Utilidor upgrades and connections; 4 Supply and construction of a pre-engineered WTP building at Williamson Lake; 5 New truck fill arm and access platform; 6 New water storage tanks; 7 New fuel tanks; 8 New electrical services, distribution, lighting, communications, and standby power systems; 9 New building mechanical systems; 10 New instrumentation and controls; 11 New skidded water treatment equipment from a single vendor including straining, DAF, UV disinfection, and UV; 12 Utility connections 13 Yard piping 14 New foundations including thermosyphons 15 Site grading; 16 Commissioning of the completed works 17 Two-year operation of the completed works Documents can be obtained from https://www.nunavuttenders.ca/

GC Bidding

Water / Sewer

$10,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
10
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 21, 2026

Project location map

Multiple Locations, Rankin Inlet, NU

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.