BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2021 at 8:00 PM

Updated January 4, 2025

Site work for a civil project in Chatham, Massachusetts. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The scope of work includes the construction of approx 600 lin ft of 10-inch HDPE directional drill installed water main, 892 lin ft of 8-inch ductile iron water main, connecting to new 10-inch main across Mitchell River and 10-inch main beyond Mitchell River to existing 8-inch PVC water main, remove and replace existing hydrant, transfer of water services, abandonment of existing 8-inch main, 1,000 lin ft of low-pressure sewer, 2-inch isolation valves, sewer laterals, new catch basin and storm drain improvements. The Contractor shall be responsible for scheduling its activities and the activities of any subcontractors involved, to meet the completion date, or milestones, established for the contract. Scheduling of the work shall be coordinated with the Owner and Engineer. The Construction Sequence Requirements shall be used by the Contractor to form a complete schedule for the project, which shall be coordinated with the Owner and Engineer. Prior to performing any work at the site, the Contractor shall submit a detailed plan to the Engineer for review. The plan shall describe the proposed sequence, methods, and timing of the work. The Construction Sequence Requirements shall be used by Contractor to form a complete schedule for the project, which shall be coordinated with the Owner and Engineer. Prior to performing any work at the site, the Contractor shall submit a detailed plan to the Engineer for review. The plan shall describe the proposed sequence, methods, and timing of the work. All existing buildings, utilities, pipes, poles, wires fences, curbings, property line markers and other structures which the Engineer decides must be preserved in place without being temporarily or permanently relocated, shall be carefully supported and protected from damage by the contractor. Should such property be damaged, it shall be restored by the Contractor, at no additional cost to the Owner.

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Site Work

22

12

2

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
139
Bidding Soon
2,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2021

October 11, 2021

Project location map

Bridge St, Chatham, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.