Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 9, 2021 at 8:00 PM
Updated January 4, 2025
Site work for a civil project in Chatham, Massachusetts. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
The scope of work includes the construction of approx 600 lin ft of 10-inch HDPE directional drill installed water main, 892 lin ft of 8-inch ductile iron water main, connecting to new 10-inch main across Mitchell River and 10-inch main beyond Mitchell River to existing 8-inch PVC water main, remove and replace existing hydrant, transfer of water services, abandonment of existing 8-inch main, 1,000 lin ft of low-pressure sewer, 2-inch isolation valves, sewer laterals, new catch basin and storm drain improvements. The Contractor shall be responsible for scheduling its activities and the activities of any subcontractors involved, to meet the completion date, or milestones, established for the contract. Scheduling of the work shall be coordinated with the Owner and Engineer. The Construction Sequence Requirements shall be used by the Contractor to form a complete schedule for the project, which shall be coordinated with the Owner and Engineer. Prior to performing any work at the site, the Contractor shall submit a detailed plan to the Engineer for review. The plan shall describe the proposed sequence, methods, and timing of the work. The Construction Sequence Requirements shall be used by Contractor to form a complete schedule for the project, which shall be coordinated with the Owner and Engineer. Prior to performing any work at the site, the Contractor shall submit a detailed plan to the Engineer for review. The plan shall describe the proposed sequence, methods, and timing of the work. All existing buildings, utilities, pipes, poles, wires fences, curbings, property line markers and other structures which the Engineer decides must be preserved in place without being temporarily or permanently relocated, shall be carefully supported and protected from damage by the contractor. Should such property be damaged, it shall be restored by the Contractor, at no additional cost to the Owner.
Post-Bid
Water / Sewer
$1,500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2021
October 11, 2021
Bridge St, Chatham, MA
Related To This Project
Chatham, MA
--
Chatham, MA
Bid Date: Feb 20 2025
Chatham, MA
Bid Date: Mar 21 2025
Chatham, MA
Bid Date: Apr 04 2025
Chatham, MA
Bid Date: Apr 07 2025
Chatham, MA
Bid Date: Dec 19 2024
Chatham, MA
--
Chatham, MA
Bid Date: Nov 07 2024
Chatham, MA
Bid Date: Sep 18 2024
Chatham, MA
Bid Date: Sep 11 2024
Chatham, MA
Bid Date: Aug 09 2024
Chatham, MA
Bid Date: Aug 08 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
