BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2022 at 7:00 PM

Updated January 15, 2025

Site work for a water / sewer project in Ridley Park, Pennsylvania. Completed plans call for site work for a water / sewer project.

The approximate cost for this project is between $350,000 to $375,000 The successful bidder, who is awarded the contract, will be required to pay PennBid Program a fee of 1/4 % of the contract award value. There is a minimum award fee of $100.00 and a maximum of $5,000.00. Bidders must confirm the fees associated with bidding through PennBid and the successful bidder is responsible for the fees associated with the awarded bid. A bid bond in the amount of ten percent (10%) of the total bid, made payable to the Township of Ridley, must accompany each bid. Attention of Bidders is called to all of the requirements contained in the bid package, particularly to the PA Prevailing Wage Rates, Public Works Employment Verification Form, various insurance requirements, various equal opportunity provisions, and the requirements for a payment bond and performance bond for 100% of the contract price and a one-year maintenance bond for 10% of the contract price. All Contractors and Subcontractors of any tier that perform work under this contract must comply with the Township of Ridley Ordinance No. 2048 - Minimum Standards of Contractor Responsibility. Each bidder must submit a Contractor Responsibility Certification, and if applicable, a Subcontractor list and Subcontractor Responsibility Certification with the bid. Failure to submit the documents may result in bid being rejected. The Township of Ridley reserves the right to accept or reject any or all bids or parts thereof, and to waive any informalities in the bidding, as them deem in the best interest of the Township. The time allowed for completion of the Contract from the date of the Notice to Proceed is specified by the Owner to be 90 calendar days CLARIFICATION DEADLINE 7/15/2021 3:00 PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$285,125.00

Public - City

Site Work

4

12

2

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
838
Active Projects
435
Bidding Soon
5,527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2021

August 23, 2021

Project location map

Braxton Rd, Ridley Park, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.