EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 5, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in South Harrison Township, New Jersey. Completed plans call for site work for a water / sewer project.

Scope of work for the On-Site Leachate Forcemain Improvements includes the installation of approximately 3,720 linear feet of proposed new 8"/12" dual contained HDPE forcemain with all associated structures, valves, and appurtenances at the Gloucester County Solid Waste Complex located at 503 Monroeville Road, South Harrison Township, New Jersey 08085. The existing leachate conveyance system shall remain operational at all times during construction. Contractor shall provide all aspects of the bypassing system to maintain the existing operations. Substantial and Contract completion times are 90 days and 120 days, respectively, after Contract Time commences to run. Bidders shall provide all personnel, supervision, services, labor, materials, tools, equipment, and supplies for i) Mobilization and demobilization; ii) All field engineering and temporary facilities, including design thereof, required to perform the Work; iii) All temporary and permanent soil erosion and sedimentation control devices; iv) Construction of leachate conveyance system components such as forcemain, pumps, valves, fittings with associated appurtenances v) Restoration of all surfaces to conditions prior to construction; and ix) Maintaining service roadways, leachate forcemain system, and landfilling operations during construction. Bids will be made on the proposal form provided, in the manner designated therein and required in the specifications, enclosed in an opaque sealed envelope and plainly marked on the outside with the date, time and item being bid. Each proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond for not less than 10 percent of the total amount bid, but not in excess of $20,000, made payable to the Gloucester County Improvement Authority. Successful bidder will be required to furnish a bond of a surety company, satisfactory to the Authority, in a sum equal to 100% of the total contract price. Any questions/clarifications must be submitted in writing no later than by Thursday, March 3, 2022. All bidders are required to comply with the requirements of P.L. 1975, C. 127 (N.J.A.C. 17:27) (Affirmative Action), P.L. 1963, C. 150 (New Jersey Prevailing Wage Act), and Americans with Disabilities Act of 1990 (42 U.S.C. 12101, et. seq.). All bidders are further notified that they must comply with N.J.S.A. 52:25-24.2, and submit an Ownership Disclosure Statement with the bid. In addition all bidders must comply with P.L. 1999, c. 238- Public Works Contractor Registration Act and the contractor and all subcontractors must be registered in accordance with the Act. The Successful Bidder must comply with all provisions of N.J.A.C. 7:22-9.1 et. seq. for the participation of small business enterprises owned and controlled by Socially and Economically Disadvantaged Individuals (SEDs). The Owner reserves the right, in accordance with all applicable laws, to reject any or all bids, to waive any informalities, deviations, or omissions in any bid or all bids, and to award the contract to the bid which is found to be the lowest responsible, responsive bidder. Furthermore, the Owner may, in accordance with applicable laws, request written clarification of any aspect of a bid or bids where, in the Owner's opinion, ambiguities exist. Except as allowed in N.J.S.A. 40A:11-23.3, no bidder may withdraw its bid for a period of sixty (60) days after the actual date of the opening of the bids.

Bid Results

Water / Sewer

$3,064,435.00

Public - County

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Structural Post-Tensioned Concrete, Precast Concrete Specialties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Access Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts, Fuel Distribution Utilities, Natural-Gas Distribution, Electrical Utilities, Electrical Utility Transmission and Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes, Trucks, Pickup Trucks

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
191
Bidding Soon
3,340
All Active Projects
1,617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 22, 2022

img_map_placeholder

503 Monroeville Road, South Harrison Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

On-Site Leachate Forcemain Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.