Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 19, 2021 at 8:00 PM
Updated March 3, 2026
Demolition, site work and renovation of an educational facility in St. Albert, Alberta. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Work of the project of which work of this contract is a part, is comprised of but not limited to, the following; .1 Selective demolition, complete demolition of existing corridor and two (2) portables as noted on the Drawings. - including the removal of concrete, grade beams, piles, etc. Confirm all existing site conditions before proceeding with the work. .2 The installation of a protective temporary secure fence around the construction area. .3 The Preparation of site to suit installation of two new modular units 'A' types to the existing cluster remaining. .4 Coordinating the installation of the screw piles to support the new modular classrooms. .5 The transport, placement, and installation of 2 premanufactured NOBLE modular classroom unit from location of manufacture at #11 - 31264 HWY 2A, Mountainview County, AB T0M 0W0 to final placement destination at 75 Akins Dr, St. Albert, AB T8N 3A5. .1 Contractor to include all costs for the transportation of the new modular from the plant to the school site. .2 Contractor to coordinate all transportation routes with all municipalities through which the transport will occur. .3 Contractor to include all costs required for the placement of the modular classroom including any roller jacking or crane costs - see 01 21 00 - Allowances. .6 The connection and set up of two (2) new modular classroom including skirting, and flashings. .7 Construct one (1) new exterior stair. .8 Modifications to the existing outdoor areas as indicated on the Drawings. .9 Repair any damage to hard or soft landscaped areas to the existing school site. .10 All associated structural, mechanical and electrical work. Documents can be obtained from https://secure.buildworkscanada.com/
Bid Results
Educational
$253,000.00
Public - State/Provincial
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2021
August 2, 2021
75 Akins Dr, St. Albert, AB
Related To This Project
St. Albert, AB
Bid Date: Mar 24 2026
St. Albert, AB
--
St. Albert, AB
Bid Date: Mar 24 2026
St. Albert, AB
Bid Date: Mar 24 2026
St. Albert, AB
Bid Date: Apr 22 2026
St. Albert, AB
Bid Date: Mar 27 2026
St. Albert, AB
Bid Date: Apr 28 2026
St. Albert, AB
Bid Date: Apr 13 2026
St. Albert, AB
--
St. Albert, AB
Bid Date: Mar 10 2026
St. Albert, AB
Bid Date: Jun 02 2021
St. Albert, AB
Bid Date: Mar 03 2026
St. Albert, AB
--
St. Albert, AB
Bid Date: Feb 17 2026
St. Albert, AB
Bid Date: Feb 12 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed