Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 18, 2021 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in Mannford, Oklahoma. Completed plans call for the construction of a 19,493-square-foot, one-story above grade municipal facility; for site work for a municipal facility; and fire / police facility.
1A Temporary Labor 1B Trash Container 1C Final Clean 1D Temporary Restroom Facilities 2A Termite Control 2B Asphalt Paving 3A Concrete 3B Insulated Concrete Forming (ICF) 4A Masonry 5A Structural Steel Framing 6A Millwork/Finish Carpentry 7A Roofing 7B EIFS and Cultured Stone 7C Joint Sealants/Waterproofing 8A Hollow Metal Doors and Frames (Including Tornado Doors and Frames) 8B Wood Doors/FRP Flush Doors 8C Aluminum Storefront and Glass Glazing (Including Auto Hardware) 8D Finish Hardware and Door (Hollow Metal, Tornado, and Wood) and Hardware Installation 8E Tornado Coiling Doors 8F Sectional Overhead Doors 9A Lt Ga Framing, Drywall, Tape & Bed, Acoustical Ceilings and Insulation 9B Floor Covering 9C Painting 9D Polished Concrete 10A Visual Display Boards 10B Toilet Partitions, Wall Protection & Corner Guards, Toilet Accessories, Fire Ext and Cabinets 10C Signage (Interior, Exterior, Tornado) 10D Lockers 11A Detention Equipment 11B Residential Appliances 12A Roller Shades 12B Office Furniture 13A Metal Building Systems (Including Retrofit Framing) 22A Plumbing 23A HVAC 23B HVAC Controls/ Building Management Systems 26A Electrical 28A Intercom, Audio, and Fire Alarm 28B Access Control and Camera 31A Storm Drainage 32A Pavement Marking and Wheel Stops 32B Fencing 32C Landscaping/Sodding
Post-Bid
Municipal
$4,700,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2021
October 11, 2021
Greenwood Ave, Mannford, OK
Related To This Project
Mannford, OK
Bid Date: Jun 08 2023
Mannford, OK
Bid Date: Aug 03 2023
Mannford, OK
Bid Date: Sep 06 2023
Mannford, OK
Bid Date: Apr 18 2024
Mannford, OK
Bid Date: Feb 16 2024
Mannford, OK
Bid Date: Jan 08 2025
Mannford, OK
--
Mannford, OK
--
Moore, OK
Bid Date: Apr 26 2022
Shawnee, OK
Bid Date: Aug 01 2022
Claremore, OK
--
Broken Bow, OK
Bid Date: Aug 30 2022
Wyandotte, OK
Bid Date: Sep 21 2022
Tishomingo, OK
Bid Date: Sep 22 2022
Tishomingo, OK
Bid Date: Sep 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.