BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a bridge / tunnel in Downers Grove, Illinois. Working plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Final Date for Plan Holder Questions July 28, 2021 at 2:00 pm local time The location of work to be performed is on: The Elgin O'Hare Western Access Tollway between I-490 Mile Post 0.4 and Mile Post 1.4 in Franklin Park, Cook County, Illinois. The work under this contract shall consist of but is not limited to: The construction of Union Pacific Railroad (UPRR) bridge over Canadian Pacific (CP) Bensenville Yard, located along I-490 between Mile Post 0.6 and Mile Post 0.9, construction of retaining wall, removal of two (2) UPRR mainline tracks and the demolition of the UPRR over Franklin Avenue Bridge, the UPRR Bridge spanning CP Track and the UPRR Bridge spanning the Metra Track. REMINDER TO VENDORS SUBMITTING FORMS B Vendors intending to fulfill certification and disclosure requirements by supplying the State with their Illinois Procurement Gateway registration number, expiration date, and FORMS B documents must read this clarification document in its entirety. VENDORS UTILIZING "FORMS B" MUST BE REGISTERED SPECIFICALLY WITH THE ILLINOIS PROCUREMENT GATEWAY TO BE DEEMED RESPONSIVE TO THIS SOLICITATION. In order to verify that you are registered with the Illinois Procurement Gateway (IPG) please click on Registered Vendor Directory on the IPG homepage. Search for your Business Name. If your company does not appear in the search results, then you are not registered in the IPG. To use FORMS B, vendors must be listed in the Registered Vendor Directory as described above and provide a valid registration number with expiration date from the Illinois Procurement Gateway Please note that it is possible for vendors, who have registered with another government entity (such as the City of Chicago's Compliance and Certification portal) using the same portal software, to have a registration number and expiration date for a different (non-State of Illinois) application process. Registration information from other government entities will not be accepted. If the Registered Vendor Directory does not list your company, then you must utilize the FORMS A option to meet the certification and disclosure requirements of this solicitation. Please submit Forms A with every bid/proposal until the State of Illinois notifies you that your IPG registration is approved and your Business Name appears in the Registered Vendor Directory as described. Women: at least 6.9 percent for all contracts. Minorities: set on a contract basis, dependent upon the county where the work will be performed. The Minority Goal for this contract is 19.6 % The cost magnitude for this project is greater than $100M. As of February 2022, this project is still in design development. A firm consstruction timeline is not yet known* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Pre-Construction/Negotiated

Bridges / Tunnels

$214,800,000.00

Public - State/Provincial

New Construction, Site Work

1687

24

18

5

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
172
Bidding Soon
3,159
All Active Projects
1,332
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 3, 2021

September 5, 2022

img_map_placeholder

I-490, Downers Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.