Site work for a pipeline in Carrollton, Kentucky. Completed plans call for site work for a pipeline.

The Project consists of two(2) bid packages as follows: Package A - constructing approximately 22,450 lf of 12" steel gas main along an existing powerline route; and Package B - constructing approximately 8,500 lf of 10-inch steel gas main along US 42 right of way. The contractor(s) for Package A and B will be responsible for providing labor and equipment for the pipeline installation. The Owner will purchase and furnish the 10" and 12" steel piping. The contractor(s) will be responsible for furnishing the remaining required materials, including but not limited to pipe fittings, Mueller fittings, valves, and appurtenances Bids will be received for single prime Contract for each bid package. Bids shall be on a unit price basis, as indicated in the Bid Form. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. The project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration (EDA Investment No. 04-01-07646) and therefore is subject to the Federal laws and regulations associated with that program. Bid security shall be furnished in accordance with the Instructions to Bidders. Bid Package A - Work shall be substantially completed within 240 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 270 days after the date when the Contract Times commence to run. Bid Package B - Work shall be substantially completed within 210 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 240 days after the date when the Contract Times commence to run. Bid Result Package A Cleary Construction Inc-$6,870,140 Package B Cleary Construction Inc-$1,516,950

Award

Pipeline

$1,571,150.00

Public - City

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
51
Bidding Soon
1,325
All Active Projects
533
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2021

September 6, 2021

img_map_placeholder

Multiple Locations, Carrollton, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.