BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2023 at 8:00 PM

Updated November 15, 2023

Site work, paving and new construction of a bridge / tunnel in Charlemont, Massachusetts. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project consisting of repair/replacing the long bridge between Charlemont and Hawley. A more detailed scope is expected to be released on a future date. As of July 15, 2021, this project is in the conceptual phase. The town is currently seeking funding for the project. Design is not moving forward until funding is obtained. A firm timeline for construction has not been established.

Conceptual

Bridges / Tunnels

$12,000,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
138
Bidding Soon
3,026
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2023

Project location map

To Be Determined, Charlemont, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.