BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 14, 2021 at 8:00 PM

Updated January 25, 2024

Site work and new construction of a pre-engineered storage facility in Springfield, Illinois. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Generally, the work includes construction of a new pre-engineered metal building for the storage of Sheriff's evidence including site work, foundations, electrical & mechanical systems and furnishings as identified in the bid documents. 1. Properly completed Proposal Form in duplicate. 2. Bid Deposit in the amount of 10% of Bid. 3. Not less than the prevailing wage rate as determined by the Illinois Department of Labor pursuant to Illinois Revised Statutes, Ch. 489, Sec. 39s-1 et. seq.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$2,672,000.00

Public - County

New Construction, Site Work

40

19

8

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
64
Bidding Soon
960
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2021

September 3, 2021

Project location map

2801 N 5th St, Springfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.