BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Newport Beach, California. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bid Valid Liquidated Damages $1,000 Per Day Estimated Bid Value $3,900,000.00 Start/Delivery Date Project Duration 200 Consecutive Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The work necessary for the completion of this contract consists of: o Construction or new 8-inch and 6-inch PVC distribution main; o Construction of new 8-inch and 6-inch valves; o Construction of new fire hydrants and water services; o Abandonment of existing asbestos cement pipe (West Irvine Terrace) and removal of existing cast-iron pipe (Balboa Island). The work necessary for the completion of this contract also includes distributing notices, providing traffic control, and pavement replacement per the Contract Documents. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Online Q&A Yes Q&A Deadline 09/20/2022 2:00 PM (PDT) Pre-Bid Meeting No

Award

Water / Sewer

$4,222,889.00

Public - City

Paving, Site Work

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
114
Bidding Soon
2,423
All Active Projects
953
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

November 1, 2022

img_map_placeholder

Multiple Locations, Newport Beach, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.