BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2022 at 8:00 PM

Updated November 15, 2023

Site work and new construction of a military facility in Fort Campbell, Kentucky. Completed plans call for the construction of a military facility; and for site work for a military facility.

W912QR21D0049 Billy W. Jarrett Construction Company, Inc. W912QR21D0050 Butt Construction Company, Inc. W912QR21D0051 Howard W. Pence, Inc. W912QR21D0052 PEM-Harkins JV LLP W912QR21D0053 Southeastern Industrial Barlovento JV-2, LLC W912QR21D0054 Zodiac-Poettker HBZ Joint Venture, LLC W912QR21D0055 ESA South, Inc. Description Replacement Overflow Fridge/Freezer. Built for a 25-year life cycle. It will be 3/4 freezer and 1/4 refrigerator space. The loading dock will be located to provide a turn-around for a tractor-trailer and convenient to access the fridge and freezers. These will be a ramp up to the loading dock. The freezers and coolers shall include an alarm system capable of either being tied into the existing Campbell BAS/DDC system or if not available, be capable of direct notification via email and phone to facility personnel indicating interruption of service. A new electric line service will be run. Furnish all materials, tools, labor costs, and other associated incidentals necessary to complete the Site Work and design requirements of the COLD STORAGE FACILITY as required by the contract document drawings and specifications. The period of performance for the project is 540 calendar days from notice to proceed. The cost range is between $500,000 and $1,000,000. PLEASE NOTE: This is for Design Bid Build construction services only.

Post-Bid

Military

$1,000,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
48
Bidding Soon
1,172
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2021

July 20, 2022

Project location map

Georgia Ave, Fort Campbell, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.