BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a sidewalk / parking lot in Cedar Hill, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

https://www.tdlr.texas.gov/TABS/Projects/TABS2022000357 Project Name: South Clark Road Pedestrian Trail Project Number: TABS2022000357 Facility Name: South Clark Road Pedestrian Trail Location Address: S. Clark Rd - Red Oak Cr Trl to E Belt Line Rd Cedar Hill, TX 75104 Location County: Dallas Start Date: 9/20/2021 Completion Date: 4/20/2022 Estimated Cost: $1,865,436 Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Construction of a shared-used path and associated drainage infrastructure improvements. Work also includes the installation of shared-use path, bicycle/pedestrian signals, cross walk, signage, safety improvements, and drainage improvements. Square Footage: 187,767 ft 2 _______________________________________________________________________________________________ The deadline to ask questions is 8/03/2021 5:00 PM The work under this contract includes furnishing all labor, tools, material, and equipment, and for performing all work necessary for construction of: a shared-used path and associated drainage infrastructure improvements. Work also includes the installation of shared-use path, bicycle/pedestrian signals, cross walk, signage, safety improvements, drainage improvements, and any other work deemed necessary by the City of Cedar Hill. All of the above shall be done in accordance with TxDOT Standard Specifications, 2014 Edition, with the City of Cedar Hill's Special Conditions as included herein and as per instructions of the OWNER. All construction sequencing and barricading will be done according to the City of Cedar Hill Standards and Details and TxDOTs Manual for Uniform Traffic Control Devices (MUTCD), unless work occurs within TxDOT ROW, in which case TxDOT standards will apply.

Post-Bid

Sidewalks / Parking Lot

$1,800,000.00

Public - City

Paving, Site Work

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
77
Bidding Soon
3,612
All Active Projects
1,316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.