BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hazard, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of August 30, 2022, information regarding award and award has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. County - Perry Route - KY-15 Item No. - 10-269.20 Project Description - Reconstruction of KY 15 from Bonnyman to near KY 28 Project Manager - Aric Skaggs, P.E. User Division - Highway Design Approximate Fee - $400,000 (Lump Sum) Preliminary Engineering & Environmental Services Project Funding - State Funds (SPP funds) Project Length - Approximately 4.4 miles KY-15 is a primary arterial route in southeast Kentucky that connects the area to the Mountain Parkway, Hal Rogers Parkway, and US-119. The road is characterized by deficient roadway geometrics, inadequate clear zone, the presence of slower moving heavy trucks, restricted passing opportunities, and no access control. Over 9.5 miles of KY-15 has been reconstructed or is currently under construction in Breathitt and Perry Counties. This section of KY-15 was previously studied and a preferred alternate selected, however, the project has set stagnate for over a decade. The purpose of this project is to further develop the preferred KY-15 alternate, identify cost efficiencies while examining the alignment, and refining the alignment for phase II progression. First Selection: August 9, 2021 Final Selection: August 25, 2021 Pre-Design Conference: September 1, 2021 Consultant Fee Proposal: September 10, 2021 Contract Negotiations: September 22, 2021 Notice To Proceed: October 13, 2021 The method of contractor selection has not been determined at this time. KYDOT - RFP Engineering - Reconstruction of KY 15

Conceptual

Roads / Highways

$59,200,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
19
Bidding Soon
397
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

img_map_placeholder

KY-15, Hazard, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.