BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2022 at 8:00 PM

Updated September 15, 2023

Site work, paving and renovation of a civil project in Los Angeles, California. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

- At the Terminal Island Water Reclamation Plant (TIWRP) on Terminal Island in the LA Harbor, - Provide, in coordination with sole-source suppliers Xylem, Krohne & Honeywell, all labor, supplies & equipment needed to design & build modifications to the AWPF/AOP & integration with existing systems necessary to implement the capability to divert water produced by the facility back into the beginning of the process & replace it with water from reserves in the event of circumstances that might lead to release of non-compliant water from the AWPF J.F. Shea Construction, Inc. is soliciting your participation in the preparation of this bid. We are particularly interested in bids from subcontractors/suppliers for the following work items: Demolition, AC Paving, Ready-Mix Concrete, Reinforcing Steel, Miscellaneous Metals, Sealants, Painting & Coatings, Electrical and Instrumentation J.F. Shea Construction, Inc. is an equal opportunity employer and intends to negotiate in good faith with interested MBE/WBE/SBE/DVBE firms and intends to utilize the lowest responsive bidder. J.F. Shea expects potential subcontractors to be bondable. J.F. Shea will pay for up to 1% for subcontractor bond costs. Subcontractors and Suppliers are expected to bid per plans and specifications, including requirements for warranties. Standard manufacturer's warranties, if not in conformance with owner's specifications, will not be accepted. The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% (See Part III of the Proposal).

Bid Results

Water / Sewer

$2,967,000.00

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
645
Active Projects
267
Bidding Soon
3,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2021

October 4, 2021

Project location map

445 Ferry St, Los Angeles, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.