BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Marathon, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of 08/04/2021 This project will be awarded tonight. No start and end date. The Village of Marathon City will be accepting sealed bids for milling and laying asphalt as specified below. Bids need to include price for milling, price per ton of asphalt and estimated tonnage for each street segment listed below. Requirements: A. Fourth Street from Walnut Street west to Pine Street 1. Provide traffic control signing and flagging as needed for our operations. 2. Mill existing roadway 1-3/4 inch at curb line and profile to center line. Coordinate hauling excess material with village to village site. 3. Sweep and prep for asphalt overlay. 4. Apply tack coat prior to paving the surface course. 5. Fine grade, water, and compact the base course material. 6. Overlay existing pavement with Type 4MT 58-28S asphalt mix compacted to an average thickness of 1-3/4 inches. B. First Street From East Street west to Market Street (two lifts) 1. Provide traffic control signing and flagging as needed for our operations. 2. Pulverize existing roadway for base course. Coordinate hauling excess material with village to village site. 3. Fine grade, water, and compact the base course material. To create a 3 percent crown in roadway. 4. Pave lower lift with WisDOT Spec. Type 3MT 58-28S asphalt mix compacted to an average thickness of 2-1/4 inches. 5. Apply tack coat prior to paving the surface course. 6. Overlay existing pavement with Type 4MT 58-28S asphalt mix compacted to an average thickness of 1-3/4 inches. C. Hillside Drive from Maraview Drive to Walnut Street 1. Provide traffic control signing and flagging as needed for our operations. 2. Pulverize existing roadway for base course. Coordinate hauling excess material with village to village site. 3. Fine grade, water, and compact the base course material. 4. Pave with WisDOT Spec. Type 4MT 58-28S asphalt mix compacted to an average thickness of 2 inches. Questions can be directed to Andy Kurtz, Village Administrator at 715-443-2221. The Village of Marathon City reserves the right to reject any or all bids and to award a contract or contracts in the best interest of the village.

Award

Roads / Highways

$156,127.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
18
Bidding Soon
220
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2021

August 26, 2021

img_map_placeholder

Multiple Locations, Marathon, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.