BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Dekalb, Illinois. Completed plans call for the renovation of a educational facility.

The work includes for the complete removal of all layers of the existing roofing systems and replacement with new KEE/PVC roofing systems. In order to replace the existing roof systems, the existing mechanical equipment mounted on the roofs shall be temporarily disconnected, carefully removed, salvaged, and reinstalled and reconnected following the installation of the new roof. New curbs and supports for the equipment on the new roofs are included. Existing deteriorated parapet walls around the perimeter of the building are to be disassembled, stone salvaged, and rebuilt with new masonry back-up. Trades included but not limited to: Selective Demolition, Cast-In-Place Concrete, Masonry, Roofing, Exterior Painting, Plumbing, HVAC, & Electrical *The closed solicitation has been included below for reference: The Northern Illinois University - DeKalb, is a 96-building facility established in 1895. The Swen Parson Hall (U1040) is a 158,987 square foot, 10-story building established in 1952. The scope of work provides for replacement of the Swen Parson Hall's flat roof areas and includes exterior stone and masonry repairs, including but limited to, perimeter fa9ades and roof parapets. The flat roof systems have saturated roof insulation and related degraded stone parapet walls involving stone displacement and falling debris. A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requiresincluding one or more MBE AND one or more WBE firms on the team). A VBE/PBE goal of 3 percent is applicable to the A/E team. The Illinois Works Jobs Program Act Apprenticeship Initiative will apply to all prevailing wage eligible work performed on this project. The interviews for this project are tentatively scheduled for September 22, 2021. PROFESSIONAL LIABILITY INSURANCE REQUIRED: $1,250,000 APPROPRIATED AMOUNT: $5,138,200 ESTIMATED TOTAL PROJECT COST: $5,138,200 Method of Contractor selection has not been determined at this point of time. The participation goal percentages on the amount of the contract awarded by CDB for this project are: 20% MBE, 5% WBE, 2% PBE/VBE

Post-Bid

Educational

$5,138,200.00

Public - State/Provincial

Renovation

37

17

22

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
94
Bidding Soon
1,806
All Active Projects
771
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

June 3, 2024

img_map_placeholder

350 Normal Rd, Dekalb, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.