BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Dale Township, Illinois. Completed plans call for site work for a water / sewer project.

**As of 08/25/2021 project has been awarded to contractors below; - Project 1 awarded to SNC Construction, Inc for$989,267.45 - Project 2 awarded to Stark Excavating, Inc for $1,062,285.00 Town employees are otherwise prohibited from answering questions prior to the bid opening. State statutes and local ordinance require the payment of prevailing wage by all contractors and subcontractors on this job. The Town of Normal reserves the right to reject any or all bids received and to waive any formalities in the bidding procedures. The bid award will be made by the Town Council and their decision will be final. Work to be performed under this Contract shall be paid for in accordance with the "Base Bid Schedule" of the Bid Form. The cost of labor, equipment, materials or work called for in the Specification, shown on the Drawings, or necessary for a complete and satisfactory installation, but which are not specifically mentioned in this Section shall be included in the appropriate pay item by the Contractor at no additional expenses to the Owner. All lien waivers submitted in connection with any request for payment shall include and be deemed to include a waiver of any and all rights under The Public Construction Bond Act (30 ILCS 550/2) as amended from time to time. Quantities necessary to complete the Work as shown on the Drawings or as specified herein shall govern over those shown in the Proposal. The Contractor shall take no advantage of any apparent error or omission in the Drawings or Specifications, and the Owner Representative shall be permitted to make corrections and interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. Pay Items which are to be measured in terms of weight shall be weighed on scales which have been approved by the Owner prior to receipt of any weighed material. Approved weight tickets must be given to the Owner prior to the material being placed. The Owner's Representative will make measurements and determinations as necessary to classify the work within pay items and determine the quantities for pay purposes; such decisions will be final after three (3) days if the Contractor does not submit a written notice as defined in the following paragraph. If the Contractor differs with the Owner's Representative's classification of the Pay Items or determination of quantities of the Pay Items, he must notify the Owner's Representative in writing within three (3) days of the time that the Contractor is informed of the Owner's Representative's decision. Otherwise the Owner will not consider any such difference as a claim for payment. Any such written notice received by the Owner's Representative from the Contractor within the three (3) day period shall be just reason for the Owner's Representative to reevaluate his previous decision. Bid Result- RIVIAN MOTORWAY WATERMAIN EXTENSION PROJECT SNC Construction, Inc $951,767 COLLEGE AVENUE WATERMAIN EXTENSION PROJECT Stark Excavating, Inc. $1,088,330

Award

Water / Sewer

$2,051,552.00

Public - City

Site Work

31

13

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
35
Bidding Soon
486
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2021

September 6, 2021

img_map_placeholder

W College Ave & Rivian Motorway, Dale Township, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.