BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2021 at 8:00 PM

Updated October 25, 2023

Site work and paving for a civil project in Hardwick, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Location: Hardwick Project Type: Highway - Construction MASSDOT - Resurfacing and Related Work (Including Bridge Number H-08-22) on Sections of Main/ Church Street (Route 32), Hardwick Road (Route 32A) and Adjacent Streets Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category The project consists of roadway reconstruction and related work on approximately 1.0 mile of Route 32 (Main Street and Church Street) and Route 32A (Hardwick Road) in the Gilbertville Village of the Town of Hardwick, Massachusetts. The work includes pavement reconstruction, pavement reclamation, hot mix asphalt and cement concrete sidewalk construction, granite curbing installation, pavement mill and overlay, stone masonry retaining wall construction, guardrail installation, stormwater drainage system construction, hydrant relocations, traffic signs and pavement marking installation, tree removal and tree protection, erosions controls, temporary traffic controls, and repairs to the superstructure of Bridge No. H-08-22. The repairs to Bridge No. H-08-22, which conveys Danforth Brook under Main Street (Route 32), include demolition of existing deteriorated portions of the existing structure which will be replaced with a new reinforced cast-in-place cement concrete slab as well as construction of new structural sidewalk and CT-TL2 barrier on the southern end of the culvert. All work under this Contract shall be done in conformance with the 2021 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, MassDOT Work Zone Safety Temporary Traffic Control, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions

Award

Bridges / Tunnels

$4,739,393.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
669
Active Projects
307
Bidding Soon
4,984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2021

November 1, 2021

Project location map

Multiple Locations, Hardwick, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.