Published August 23, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Topeka, Kansas. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Prepare Concept Plans, Field Check Plans, Utility Field Check Plans, Office Check Plans and Final Plans, Cost Estimates, and Bidding Documents. Prepare Right-of-Way Plans and Legal Documents for the Appraisal and Acquisition of necessary easements. Secure Certificates of Title for those properties from which easements will be appraised and acquired. Provide field survey staking for easements to be appraised and acquired. Prepare a Geotechnical Engineering Report for the substructure elements of the proposed bridge. Prepare and submit all necessary applications for permits required by the Corps of Engineers, State of Kansas Department of Agriculture, Division of Water Resources and any other Federal or State Agency with permitting authority over rivers and streams in the State of Kansas. Assist the Shawnee County Department of Public Works Utility Coordination as defined in the Shawnee County Design Criteria, latest edition. Plans to be prepared in accordance with KDOT Design Standards for Bridges, latest edition for letting by the Kansas Department of Transportation (KDOT). Notice to Proceed September 2022 Concept Plans and Cost Estimates October 2022 Field Check Plans & Cost Estimate to KDOT / SNCO December 2022 Field Check Utility Plans to Utility Companies January 2023 Right-of-Way Plans and Documents to SNCO January 2023 Permits Submitted to Corps of Engineers & KS DWR March 2023 Office Check Plans and Cost Estimate to KDOT / SNCO May 2023 Final Plans, Bidding Documents and Engineers Estimates to SNCO June 2023 Plans, Specifications & Estimates (PSE) to KDOT Bureau of Local Projects July 2023 KDOT Bid Letting October 2023 Project will be ready for Kansas Department of Transportation (KDOT) letting in October 2023 with construction to follow in calendar year 2024. The method of contractor selection has not been determined at this time.

Conceptual

Bridges / Tunnels

$651,001.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
54
Bidding Soon
1,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2024

Project location map

NW 78th St, Topeka, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.