Site work and paving for a mixed-use development in Chicago, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Deadline for Questions 02-Aug-2021 16:00:00 Utility work in certain project locations will impact the date that these work sites will be available to the Contractor. This utility work is in addition to structure adjustments that are typically associated with roadway resurfacing. The Contractor will still be required to coordinate the adjustment of private utility structures with the contract work. Milestone 1 Submit a project schedule, including submittal dates for permits, within 14 calendar days after Notice to Proceed. Milestone 1A Submit a revised project schedule within 7 calendar days after receiving comments. This milestone applies to all subsequent project schedule revisions that may be required either until initial approval or as work progress dictates. Milestone 2 Complete the placement of Leveling Binder (Machine Method) within 7 calendar days of HMA surface removal for all locations regardless of pavement surface area milled. Milestone 2A Complete all permanent pavement marking work at all locations within 14 calendar days of HMA surface course placement. Milestone 3 Complete HMA surface removal on project locations totaling six miles in length by November 1, 2021. Milestone 4 Complete all work on all locations by July 31, 2022. Milestone 5 All work associated with Winter Shutdown must be completed by December 18, 2021 or by the Wednesday before Thanksgiving for locations within the central business district holiday moratorium. Winter shutdown work will include all HMA surface paving, ADA ramp installation, pavement markings, and the removal of all vehicle and pedestrian temporary traffic controls. All sites will be secured to the satisfaction of the Commissioner at no additional cost to the City.

Award

Roads / Highways

$8,231,477.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
94
Bidding Soon
1,818
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.