Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Santa Barbara, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The project replaces the existing structurally deficient bridge located on Hollister Street over Tecolotito Creek, between Los Carneros Road and Cremona Drive. The project is estimated at $11.7 million for preliminary engineering, right-of-way, and construction phases. The City match requirement for this bridge is estimated to be 11.47%, which is the standard under the Highway Bridge Program (HBP). This project is currently in the City of Santa Barbara's FY 2022-2026 CIP. Per the owner, as of September 26, 2023, this project has not begun design. The owner states that construction on this project is at least ten years out. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$11,700,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2033
Hollister Ave, Santa Barbara, CA
Related To This Project
Santa Barbara, CA
Bid Date: Jun 20 2022
Santa Barbara, CA
Bid Date: May 26 2022
Santa Barbara, CA
Bid Date: Jan 19 2022
Santa Barbara, CA
Bid Date: Mar 02 2022
Santa Barbara, CA
Bid Date: Jul 14 2022
Santa Barbara, CA
--
Santa Barbara, CA
Bid Date: Jul 21 2022
Santa Barbara, CA
Bid Date: Jul 28 2022
Santa Barbara, CA
Bid Date: Jul 13 2022
Santa Barbara, CA
Bid Date: Jul 08 2022
Santa Barbara, CA
Bid Date: Jul 06 2022
Santa Barbara, CA
Bid Date: Jun 02 2022
Santa Barbara, CA
Bid Date: Aug 17 2021
Santa Barbara, CA
Bid Date: Mar 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.