Published September 14, 2021 at 8:00 PM

Updated September 14, 2023

Renovation of a conference / convention center in Boston, Massachusetts. Working plans call for the renovation of a conference / convention center.

**As of 9/14/2021, the project was not awarded because it came in over budget. Hynes Convention Center Loading Dock - This project includes providing all labor, equipment, implements, and materials required to furnish and install all HVAC work (complete and operable), all as more fully set forth in the Drawings and Specifications. General Bid Deadline 9/3/21 Time 12:00 P.M. Questions or requests for information, clarification or interpretation of the bidding documents must be submitted in writing to bflynn@massconvention.com and cc imetaj@signatureboston.com in accordance with the Instructions to Bidders and must be received no later than 5:00 PM, August 13, 2021. The work includes, but is not necessarily limited to, work listed under Section 230000 Paragraph 1.2 at the Hynes Convention Center in Boston, and as described in the Contract Documents. Provide all labor, equipment, implements, and materials required to furnish and install all HVAC work (complete and operable) as shown on the drawings and as noted in specifications. See items below for additional information on scope of work. The HVAC contractor will be the General Contractor on this project. The General Contractor is also occasionally called Contractor in this specification manual. Following trades will either be filed Sub-bid contractors or sub-contractors under the HVAC contractor: a. Instrumentation and Control for HVAC b. Testing and Balancing Sub-contractor c. Electrical Sub-contractor. Replace ceiling tiles in kind that get damaged as part of the work in this project. HVAC contractor to carry an allowance of $1,000 for ceiling tiles. Any amount unused from this allowance to be credited back to the Client at the end of the project. Labor to install ceiling tiles shall be provided by the HVAC General Contractor. Substantial Completion -December 31, '21 + Final Completion(+ 30 Days) MBE Participation 4.7% WBE Participation 9.3%

Final Planning

Conference / Convention Centers

$499,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Floor Plates
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustic Treatment, Acoustic Wall Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
157
Bidding Soon
2,802
All Active Projects
1,208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2021

March 14, 2022

img_map_placeholder

900 Boylston St, Boston, MA


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Hynes Convention Center - Loading Dock MEP Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.