BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Boston, Massachusetts. Working plans call for the renovation of a conference / convention center.

**As of 9/14/2021, the project was not awarded because it came in over budget. Hynes Convention Center Loading Dock - This project includes providing all labor, equipment, implements, and materials required to furnish and install all HVAC work (complete and operable), all as more fully set forth in the Drawings and Specifications. General Bid Deadline 9/3/21 Time 12:00 P.M. Questions or requests for information, clarification or interpretation of the bidding documents must be submitted in writing to bflynn@massconvention.com and cc imetaj@signatureboston.com in accordance with the Instructions to Bidders and must be received no later than 5:00 PM, August 13, 2021. The work includes, but is not necessarily limited to, work listed under Section 230000 Paragraph 1.2 at the Hynes Convention Center in Boston, and as described in the Contract Documents. Provide all labor, equipment, implements, and materials required to furnish and install all HVAC work (complete and operable) as shown on the drawings and as noted in specifications. See items below for additional information on scope of work. The HVAC contractor will be the General Contractor on this project. The General Contractor is also occasionally called Contractor in this specification manual. Following trades will either be filed Sub-bid contractors or sub-contractors under the HVAC contractor: a. Instrumentation and Control for HVAC b. Testing and Balancing Sub-contractor c. Electrical Sub-contractor. Replace ceiling tiles in kind that get damaged as part of the work in this project. HVAC contractor to carry an allowance of $1,000 for ceiling tiles. Any amount unused from this allowance to be credited back to the Client at the end of the project. Labor to install ceiling tiles shall be provided by the HVAC General Contractor. Substantial Completion -December 31, '21 + Final Completion(+ 30 Days) MBE Participation 4.7% WBE Participation 9.3%

Final Planning

Conference / Convention Centers

$499,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
165
Bidding Soon
2,668
All Active Projects
1,099
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2021

March 14, 2022

img_map_placeholder

900 Boylston St, Boston, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.