Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Clinton, Massachusetts. Completed plans call for the renovation of a water / sewer project.
Q And A Open: 07/22/2021 09:30:00 PM Q And A Close: 08/10/2021 02:30:00 AM This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement. Influent Screw Pump Replacement, Phase 1. Contractor Category: Mechanical. The work ofthis Contract is located in Clinton, MA at the Clinton Wastewater Treatment Plant (WWTP). Contract Time: The Contract time is 540 calendar days from the effective Notice to proceed date. Liquidated Damages: Liquidated damages amount is $2,200 per calendar day. Notwithstanding Article 5 ofthe Authority-Contractor Agreement, the $2,200 per calendar day liquidated damage amount set forth herein applies to the achievement of Substantial Completion as defined in Section 00700 of the Contract. The Clinton Wastewater Treatment Plant is owned and operated by the Massachusetts Water Resources Authority (MWRA) to provide advanced wastewater treatment, including nutrient removal, for the Towns of Clinton and Lancaster, Massachusetts prior to discharging the treated effluent to the South Nashua River. The treatment facility is designed to treat an average daily flow of 3.01 million gallons per day (mgd). The treatment facility includes preliminary treatment in the form of grit removal, and reening/comminution followed by primary settling, trickling filtration, aeration tanks, secondary clariflocculators for nutrient removal, tertiary treatment disc filtration system for phosphorus removal and chlorination prior to discharge to the river. The facility also includes an anaerobic digestion system consisting of primary and secondary digester tanks followed by digested sludge storage and sludge dewatering facilities. Furnish all labor, materials, equipment and incidentals necessary for the Replacement ofthe Influent Lift Station Screw Pumps. The Work includes the following major items ofwork as indicated and specified. Replacement ofthree (3) enclosed 48-inch diameter screw pumps. Replacement ofthree (3) 72-inch by 60-inch slide gates. Bypass pumping as required for installation of new equipment. Installation of new electrical equipment for screw pumps. Concrete surface and crack repairs. Installation of new instrumentation and controls and replacement of select existing instrumentation. Replacement ofthe influent Clinton and Lancaster Parshall flume flow analyzer and transmitters. This Section specifies the requirements for performing cutting, coring and patching for all structural elements during construction. Structural elements shall not be cut, cored and patched in a manner that reduces their load carrying capacity or load-deflection ratio. Do not cut, core and patch facilities in service or personnel protection items in a manner that reduces their capacity to perform or impacts safety. All cutting, coring, and rough patching shall be performed by the Contractor. Finish patching shall be performed by the trade associated with the application ofthe particular finish.
Award
Water / Sewer
$3,452,985.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2021
December 13, 2021
677 High St, Clinton, MA
Related To This Project
Clinton, MA
Bid Date: Dec 29 2021
Clinton, MA
Bid Date: Apr 04 2022
Clinton, MA
Bid Date: Mar 28 2022
Clinton, MA
Bid Date: Mar 28 2022
Clinton, MA
Bid Date: Nov 02 2023
Clinton, MA
Bid Date: Oct 19 2023
Clinton, MA
Bid Date: Nov 09 2023
Clinton, MA
Bid Date: Oct 27 2021
Clinton, MA
Bid Date: Oct 27 2021
Clinton, MA
Bid Date: Nov 16 2021
Clinton, MA
Bid Date: Nov 17 2021
Clinton, MA
Bid Date: Dec 17 2021
Clinton, MA
--
Clinton, MA
Bid Date: Dec 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.