Published October 27, 2021 at 8:00 PM

Updated September 15, 2023

Renovation of a conference / convention center in Boston, Massachusetts. Working plans call for the renovation of a conference / convention center.

**As of 10/27/2021, the project was not awarded because bids came in over budget. The Authority is talking about the next steps. This project includes providing all labor, equipment, implements, and materials required to furnish and install all HVAC work (complete and operable), all as more fully set forth in the Drawings and Specifications. Questions Due: 5 PM, August 13, 2021 Bflynn@massconvention.com MCCA PROJECT NO:20-302-160080-99999999-P24 Each bid shall be submitted and will be considered in accordance with the Instructions to Bidders and other Contract Documents, and shall be accompanied by a bid deposit in the amount of 5% of the value of the bid. Questions or requests for information, clarification or interpretation of the bidding documents must be submitted in writing to bflynn@massconvention.com and cc imetaj@signatureboston.com in accordance with the Instructions to Bidders and must be received no later than 5:00 PM, August 13, 2021. Each general bid on this contract must be accompanied by a copy of a Certificate of Eligibility issued by the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) showing that the bidder has the classification and capacity rating to perform the work required. In order to be eligible to bid on this contract, a general bidder must be certified for the estimated project cost of $250,000 and for the following category of work: Prime Contractors - HVAC Each general bid must also be accompanied by a Contractor Qualification Update Statement. The Authority will furnish copies of the Contractor Qualification Update Statement form to any bidder on request. Any general bid submitted without the appropriate Certificate of Eligibility and Contractor Qualification Update Statement shall be invalid. The Authority reserves the right to waive any informality in or to reject any or all bids if it be in the public interest to do so. The Authority reserves the right to cancel this procurement at any time without liability to any bidder or other party. The successful general bidder will be required to furnish a labor and materials or payment bond as set forth in the bid form. Attention is called to the minimum rates of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Sections 26 to 27D, inclusive, as amended, and as set forth in the Contract Documents, which the contractor will be required to pay. There is no pre-qualification for this project, besides the standard documentation (DCAMM, Update Letter, Bid/performance bond, etc…) as specified in the Project Manual

Final Planning

Conference / Convention Centers

$499,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Floor Plates
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustic Treatment, Acoustic Wall Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
146
Bidding Soon
2,822
All Active Projects
1,149
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.